Skip to content
Division of Purchasing

Part 8 - JF26-44 216300 Final

Solicitation: Not available
Notice ID: ut-u3p-223118
DepartmentDivision of PurchasingStateUTPostedDueFeb 26, 2026, 05:30 PM UTCExpired

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,224,714,355
Sector total $7,224,714,355 • Share 100.0%
Live
Median
$252,161
P10–P90
$30,768$1,428,923
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,224,714,355)
Deal sizing
$252,161 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260024 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Wasatch
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260024 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Wasatch
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260014 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Millard
Rate
TRUCK DRIVER (Water Truck)
Base $29.53Fringe $14.65
Rate
CARPENTER, Includes Form Work
Base $22.07Fringe $6.88
Rate
CEMENT MASON/CONCRETE FINISHER
Base $17.36Fringe $2.04
+25 more occupation rates in this WD
Davis-Baconstate match
UT20260078 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Wasatch
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+13 more occupation rates in this WD
Davis-Baconstate match
UT20260094 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Washington
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
CEMENT MASON/CONCRETE FINISHER
Base $19.69Fringe $1.17
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Part 8 - JF26-44 216300 Final

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity titled 'Part 8 - JF26-44 216300 Final' is issued by the Division of Purchasing. The response deadline is set for February 26, 2026, at 17:30 UTC. Specific details regarding performance periods or scope of work are currently not provided.

Part 8JF26-44216300Division of Purchasing
What the buyer is trying to do

The buyer is seeking proposals related to Part 8 - JF26-44 216300, although specific project requirements are not outlined in the available information.

Who should pursue this
  • Vendors with experience in similar purchasing categories or relevant products.
Work breakdown
No work breakdown extracted.
Response package checklist
  • Cover Letter
  • Completed Proposal Form (if applicable)
  • Company Profile
  • Relevant Work History
  • Key Personnel Resumes
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
No compliance notes extracted.
Pricing strategy
  • Consider competitive pricing to attract the buyer, given the lack of specific pricing information.
  • Research similar contracts to establish a benchmark for proposals.
Teaming and subs
No teaming notes extracted.
Risks and watchouts
  • Lack of detailed scope may lead to assumptions that could misalign proposals with buyer expectations.
  • Deadline is far in the future, requiring long-term resource planning.
Smart questions to ask
  • What are the specific goals and deliverables expected for Part 8 - JF26-44 216300?
  • Are there any constraints or requirements we should be aware of before preparing our proposal?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific project scope and deliverables are not detailed.
  • No performance period dates provided.
  • Lack of solicitation number prevents thorough tracking.
  • NAICS codes are unspecified, making compliance checks difficult.
  • No attachment links or additional documentation noted.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.