Skip to content
Division of Purchasing

AS26-39 Statewide Wildfire Prevention Campaign

Solicitation: Not available
Notice ID: ut-u3p-220973
DepartmentDivision of PurchasingStateUTPostedDueFeb 26, 2026, 09:00 PM UTCExpired

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$6,934,604,320
Sector total $6,934,604,320 • Share 100.0%
Live
Median
$206,573
P10–P90
$30,957$1,243,935
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,934,604,320)
Deal sizing
$206,573 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260039 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Weber
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
+49 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 49 more rate previews.
Davis-BaconBest fitstate match
UT20260039 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Weber
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
Rate
Backhoe/Excavator, Front End Loader (Over 5 cu. yds. )
Base $25.37Fringe $15.65
+48 more occupation rates in this WD
Davis-Baconstate match
UT20260031 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Davis
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
Rate
Backhoe/Excavator, Front End Loader (Over 5 cu. yds. )
Base $25.37Fringe $15.65
+48 more occupation rates in this WD
Davis-Baconstate match
UT20260098 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Sanpete
Rate
CARPENTER, Includes Form Work
Base $22.34Fringe $3.48
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.21Fringe $2.87
Rate
ELECTRICIAN
Base $26.83Fringe $0.00
+26 more occupation rates in this WD
Davis-Baconstate match
UT20260074 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Piute
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

AS26-39 Statewide Wildfire Prevention Campaign

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.