Skip to content
Division of Facilities Construction and Management

DFCM Construction - Standard Low Bid - SUU - Business Building Settlement Repair and Landscaping- Project #26071730

Solicitation: Not available
Notice ID: ut-u3p-219865

Federal opportunity from EXECUTIVE BRANCH AGENCIES • Division of Facilities Construction and Management. Place of performance: UT. Response deadline: Feb 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260026 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Duchesne
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260026 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Duchesne
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260087 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $31.66Fringe $13.97
Rate
ELEVATOR MECHANIC
Base $55.43Fringe $38.43
Rate
PAINTER (Spray Only)
Base $26.00Fringe $8.78
+20 more occupation rates in this WD
Davis-Baconstate match
UT20260091 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Davis
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
TRUCK DRIVER (Dump Truck)
Base $29.67Fringe $14.65
+6 more occupation rates in this WD
Davis-Baconstate match
UT20260004 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Kane, San Juan
Rate
CARPENTER (Including Formwork and Framing)
Base $10.00Fringe $0.00
Rate
ELECTRICIAN
Base $12.76Fringe $0.00
Rate
Carpet (Carpet, Vinyl, and Linoleum)
Base $11.00Fringe $0.00
+4 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Facilities Construction and Management
Agency
EXECUTIVE BRANCH AGENCIES
Subagency
EXECUTIVE BRANCH AGENCIES
Office
DFCM
Contracting Office Address
Not available

Description

DFCM Construction - Standard Low Bid - SUU - Business Building Settlement Repair and Landscaping- Project #26071730

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.