Skip to content
DFCM - Division of Facilities Construction and Management

DFCM Construction - Prequalified General Stage II - Administrative Office of the Courts - Ogden Courts Fire Pump Replacement - Project #26197150

Solicitation: Not available
Notice ID: ut-u3p-218359

Federal opportunity from EXECUTIVE BRANCH AGENCIES • DFCM - Division of Facilities Construction and Management. Place of performance: UT. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,206,283,725
Sector total $7,206,283,725 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,015,226
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,206,283,725)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260025 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Daggett
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260025 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Daggett
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260104 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Box Elder
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.19Fringe $6.82
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260086 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Tooele
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $31.66Fringe $13.97
Rate
ELEVATOR MECHANIC
Base $55.43Fringe $38.43
Rate
DRYWALL FINISHER/TAPER
Base $26.00Fringe $8.78
+23 more occupation rates in this WD
Davis-Baconstate match
UT20260072 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Grand
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
DFCM - Division of Facilities Construction and Management
Agency
EXECUTIVE BRANCH AGENCIES
Subagency
EXECUTIVE BRANCH AGENCIES
Office
Not available
Contracting Office Address
Not available

Description

DFCM Construction - Prequalified General Stage II - Administrative Office of the Courts - Ogden Courts Fire Pump Replacement - Project #26197150

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.