RFP Saratoga Springs Fire Station Architect and Design Service
Federal opportunity from CITIES • City of Saratoga Springs. Place of performance: UT. Response deadline: Feb 24, 2026.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 35 more rate previews.↓
Point of Contact
Agency & Office
Description
RFP Saratoga Springs Fire Station Architect and Design Service
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The RFP for the Saratoga Springs Fire Station Architect and Design Service is currently open, with a response deadline set for February 24, 2026. This opportunity indicates a need for architectural and design services specifically tailored for a fire station project in Saratoga Springs. Interested bidders must align their proposals with the specialized needs of public safety facilities.
The buyer is seeking comprehensive architectural and design services for the development of a new fire station in Saratoga Springs, focusing on optimized layout, functionality, and integration with community needs.
- Architecture firms with experience in public safety facilities
- Design firms with fire station project backgrounds
- Local firms familiar with Saratoga Springs regulations
- Assess current fire department needs
- Develop architectural design options
- Create detailed design documents
- Provide consultation throughout the construction phase
- Ensure compliance with local building codes
- Cover letter
- Company profile and relevant experience
- Proposed project timeline
- Cost estimate
- Team resumes and qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local zoning laws
- Follow public safety building specifications
- Incorporate sustainable design practices
- Competitive pricing based on market rates for architectural services
- Fixed-price proposals may be preferred
- Consider partnering with local contractors
- Engage consultants specialized in fire station design
- Delays in design approval from city officials
- Changes in scope based on community feedback
- Potential budget constraints during project execution
- What specific functionalities are prioritized for the fire station?
- Are there existing designs or concepts that the city favors?
- What is the budget range allocated for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific scopes of work and design requirements are unclear.
- Contracts or funding sources for the project not disclosed.
- Potential partnerships or collaboration expectations not detailed.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.