Skip to content
City of Saratoga Springs

RFP Saratoga Springs Pony Express Parkway Completion Project

Solicitation: Not available
Notice ID: ut-u3p-218684
DepartmentCity of Saratoga SpringsAgencyCitiesStateUTPostedDueFeb 25, 2026, 10:00 PM UTCExpired

Federal opportunity from CITIES • City of Saratoga Springs. Place of performance: UT. Response deadline: Feb 25, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260024 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Wasatch
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260024 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Wasatch
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260104 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Box Elder
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.19Fringe $6.82
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260086 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Tooele
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $31.66Fringe $13.97
Rate
ELEVATOR MECHANIC
Base $55.43Fringe $38.43
Rate
DRYWALL FINISHER/TAPER
Base $26.00Fringe $8.78
+23 more occupation rates in this WD
Davis-Baconstate match
UT20260017 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Beaver, Emery, Grand +3
Rate
OPERATOR: Power Equipment (3)Backhoe/Excavator
Base $30.78Fringe $16.09
Rate
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher
Base $35.68Fringe $17.57
Rate
Oiler
Base $22.03Fringe $11.88
+21 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Saratoga Springs
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

RFP Saratoga Springs Pony Express Parkway Completion Project

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The RFP for the Saratoga Springs Pony Express Parkway Completion Project emphasizes the city's commitment to infrastructure development. Key details suggest significant planning and execution will be required to meet the needs of the community. Proposals are due by February 25, 2026, providing a timeline for interested bidders to prepare thorough responses.

Saratoga SpringsPony Express ParkwayInfrastructureRoad constructionCompletion project
What the buyer is trying to do

The buyer aims to finalize the construction and completion of the Pony Express Parkway, ensuring it meets safety and operational standards for public use.

Who should pursue this
  • Construction firms with experience in parkway or road projects
  • Civil engineering consultants
  • Local businesses familiar with the area and community needs
Work breakdown
  • Project planning and design
  • Site preparation and construction
  • Quality assurance and safety compliance
  • Community engagement
  • Post-construction evaluation and reporting
Response package checklist
  • Technical proposal detailing approach and methodology
  • Past performance records of similar projects
  • Management plan and staffing resources
  • Cost proposal with detailed breakdown
  • Compliant bid format as per RFP requirements
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all proposals meet local, state, and federal regulations
  • Verify adherence to safety standards
  • Confirm environmental impact considerations
Pricing strategy
  • Develop a competitive pricing structure while maintaining quality standards
  • Consider local market rates for labor and materials
  • Account for potential cost overruns during the project timeline
Teaming and subs
  • Consider partnering with local subcontractors for community engagement
  • Engage with firms specializing in environmental assessments if necessary
  • Explore alliances with engineering firms for technical expertise
Risks and watchouts
  • Possible delays due to regulatory approvals
  • Community opposition or feedback impacting project execution
  • Budget overruns if not monitored closely
Smart questions to ask
  • What are the specific safety and design standards required?
  • Are there any anticipated environmental challenges?
  • What is the expected timeline for obtaining necessary permits?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget information provided
  • Details on local regulations are absent
  • Lack of information on necessary permits
  • No key milestones or deliverables outlined
  • No description of performance metrics
  • No insights on previous projects or benchmarks
  • Absence of stakeholders' expectations
  • No community engagement requirements mentioned

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.