Skip to content
American Fork

200 South 300 West Roundabout

Solicitation: Not available
Notice ID: ut-u3p-223943
DepartmentAmerican ForkAgencyCitiesStateUTPostedDueMar 18, 2026, 06:00 PM UTCCloses in 20 days

Federal opportunity from CITIES • American Fork. Place of performance: UT. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
American Fork
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

200 South 300 West Roundabout

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Executive summary

The CITIES agency is soliciting bids for the construction of a roundabout at 200 South 300 West, aiming to improve traffic flow and safety in the area. The response deadline for proposals is set for March 18, 2026. This opportunity presents significant potential for local construction and engineering firms with experience in public infrastructure projects.

What the buyer is trying to do

The buyer is looking to enhance traffic management and safety by constructing a roundabout at the specified intersection.

Work breakdown
  • Site assessment and preparation
  • Design of the roundabout
  • Construction of the roundabout structure
  • Traffic management during construction
  • Landscaping and finishing works
Response package checklist
  • Cover letter
  • Bid proposal outlining approach and timeline
  • Cost estimate and pricing strategy
  • Evidence of relevant experience and qualifications
  • Proof of bonding and insurance
Suggested keywords
roundabout constructiontraffic managementpublic infrastructurecivil engineering
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget range provided
  • Absence of detailed engineering specifications
  • Unclear funding source for the project
  • Lack of a list of required permits
  • No information on previous similar projects
  • Missing details on community engagement plans
  • No stated environmental impact requirements
  • Absence of known stakeholders

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.