Project 25-101-ABL - Generator Replacements at Abilene State Supported Living Center
Federal opportunity from 529. Place of performance: TX. Response deadline: Feb 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Health and HumanServices Commission, for and on behalf of its Health and Specialty Care System Division, is soliciting Competitive Sealed Proposals for selection of a General Contractor to provide general construction and construction administrationservices to the Owner for Project 25-101-ABL - Generator Replacementsat Abilene State Supported Living Center in accordancewith the terms, conditions, and requirements set forth in this Solicitation. This Solicitation isbeing issued to select a Contractor for the Project as provided by TexasGovernment Code , Section 2155.144(b-2) and Chapter 2269,Subchapter D. Project Location, Summary, andBudget Project Location: Abilene StateSupported Living Center 2501 Maple Street Abilene, TX, 79602 Project Summary: The work covered bythis project consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services,supplies, and incidentals and of performing all operations in connection with thisproject for each generator replacement, in strict accordance with these plans,specifications, and the contract documents. For complete Projectinformation, refer to Attachments H-1, Project Drawings, and H-2, Project Specifications, to the Exhibit C – Draft GeneralConstruction Services Contract . Project Estimate: The approximate cost for construction of the Project is $14,000,000.00 . Optional Pre-Proposal Webinar andMandatory Jobsite Visits HHSC will conduct one(1) optional pre-proposal webinar that will be held on the date and timedescribed below. Attendance at the pre-proposal webinar is optional,and attendance at one (1) site visit is mandatory . Mandatory JobsiteWalkthroughs: All Respondents arerequired to attend one Facility Site Visit as specified in Section 2.2 (Schedule of Events). Potential Respondents should be prepared to complete oneof the scheduled tours; additional tours will not be offered. Jobsite Walkthrough Location: Abilene StateSupported Living Center 2501 Maple Street Abilene, TX, 79602 See ExhibitH – Site Map .
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.