Skip to content
Tennessee Department of General Services

Tennessee CPO ITB 32701-13874

Solicitation: Not available
Notice ID: tn_cpo__ITB 32701-13874
Contract snapshot

Federal opportunity from Central Procurement Office • Tennessee Department of General Services. Place of performance: TN.

Source
Open on official portal →
Solicitation
tn_cpo__ITB 32701-13874
Performance
TN
Response
No due date posted
Open on official portal →
Live POP
Place of performance
TN
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Tennessee Department of General Services
Agency
Central Procurement Office
Subagency
Central Procurement Office
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TN20260181 (Rev 1)
Published May 18, 2026Tennessee • Jefferson
30 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 28 more rate previews.
Davis-BaconBest fitstate match
TN20260181 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Jefferson
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $38.17Fringe $18.82
Rate
POWER EQUIPMENT OPERATOR: CRANE
Base $36.25Fringe $13.40
Rate
IRONWORKER: ORNAMENTAL
Base $35.32Fringe $17.02
+27 more occupation rates in this WD
Davis-Baconstate match
TN20260151 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Bedford, Coffee
Rate
POWER EQUIPMENT OPERATOR: CRANE
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $33.23Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR (BACKHOE/TRACKHOE/EXCAVATOR)
Base $33.23Fringe $13.40
+9 more occupation rates in this WD
Davis-Baconstate match
TN20260002 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Cocke
Rate
ROOFER: SHAKE & SHINGLE ROOF
Base $11.41Fringe $0.00
Rate
PLUMBER
Base $12.66Fringe $0.00
Rate
PAINTER: BRUSH, ROLLER AND SPRAY
Base $10.34Fringe $0.00
+7 more occupation rates in this WD
Davis-Baconstate match
TN20260025 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Cannon, Cheatham, Dickson +7
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $10.25Fringe $0.00
Rate
PLUMBER
Base $17.50Fringe $0.00
Rate
OPERATOR: BACKHOE
Base $13.17Fringe $0.00
+6 more occupation rates in this WD

Description

ITB # 32701 -13874 – Amendment # 1 Page 1 of 1 STATE OF TENNESSEE Environment and Conservation ITB # 32701 -13874 AMENDMENT # 1 FOR SAVAGE G ULF S.P. FUEL TANKS DATE : April 24, 2026 ITB # 32701- 13874 IS AMENDED AS FOLLOWS: 1. This ITB Schedule of Events updates and confirms scheduled ITB dates. Any event, time, or date containing revised or new text is highlighted. INSERT ITB SCHEDULE OF EVENTS ITB POST DATE APRIL 8, 2026 QUESTIONS AND COMMENTS DEADLINE APRIL 29 , 2026 RESPONSE DEADLINE MAY 8 , 2026 2. Delete ITB Terms and Conditi ons provis ion 1.3 in its entirety and insert the following in its place (any sentence or paragraph containing revised or new text is highlighted): Each prospective Respondent must carefully review this ITB, including but not limited to, attachments, terms and conditions, and any amendments, for questions, comments, defects, objections, or any other matter requiring clarification or correction (collec tively called "questions and comments"). Protests based on any objection to the ITB shall be considered waived and invalid if the objection has not been brought to the attention of the State, in writing, by the Written Questions & Comments Deadline. Any p rospective Respondent having questions and comments concerning this ITB must provide them in writing to the Solicitation Coordinator. All questions must be submitted no later than 2:00 pm CST April 29h, 2026. 3. ITB Amendment Effective Date. The revisions set forth herein shall be effective upon release. All other terms and conditions of this ITB not expressly amended herein shall remain in full force and effect.

Advisory bid range

Pricing and bid posture

high confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.