Skip to content
Washington County

2026.027-ITB 100820 - 2026 Survey Monument Box Installation

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-C03342-00016202
DepartmentWashington CountyAgencyC0334207 - Lut | C0334 - LutStateORPostedDueMar 25, 2026, 02:00 PM UTCCloses in 16 days

Federal opportunity from C0334207 - LUT | C0334 - LUT • Washington County. Place of performance: OR. Response deadline: Mar 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,013,944,150
Sector total $1,013,944,150 • Share 100.0%
Live
Median
$112,666
P10–P90
$29,601$598,044
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,013,944,150)
Deal sizing
$112,666 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Suzanne Fulcher * 155 N 1st Avenue 270 Hillsboro , OR 97124 US Email: Phone: (503) 846-8734
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260001 (Rev 1)
Match signal: state match • county matchOpen WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match • county match
OR20260001 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
Piledriver
Base $55.79Fringe $15.81
+45 more occupation rates in this WD
Davis-Baconstate match • county match
OR20260061 (Rev 0)
Open WD
Published Jan 02, 2026Oregon • Washington
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Including Form Work)
Base $53.94Fringe $16.81
+38 more occupation rates in this WD
Davis-Baconstate match
OR20260103 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson, Josephine
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
TILE FINISHER
Base $32.68Fringe $16.48
+27 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Washington County
Agency
C0334207 - LUT | C0334 - LUT
Subagency
C0334207 - LUT | C0334 - LUT
Office
Danielle Howard | Phone: | (503) 846-8734
Contracting Office Address
Not available

Description

2026.027-ITB 100820 - 2026 Survey Monument Box Installation This post is for advertisement purposes only. Go to the Washington County Solicitation portal at www.washcopurch.com/biz for full details and to respond to the solicitation. Washington County is seeking services for the installation of Survey Monument Boxes throughout Washington County. Work under this contract will include but is not limited to: Traffic control, Asphalt coring/cutting, Monument box installation, asphalt patching, and additional/incidental work as called for by the specifications. All Work to be done under the Contract is to be completed prior to June 30, 2026.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 09, 2026
Executive summary

The State of Oregon has announced a solicitation for the installation of Survey Monument Boxes across Washington County, with a response deadline set for March 25, 2026. This project includes essential tasks such as traffic control, asphalt coring/cutting, and monument box installation, along with related maintenance and repair work. Contractors must complete all work prior to June 30, 2026, aligning with the structured timeline provided.

What the buyer is trying to do

Washington County aims to enhance infrastructure by installing Survey Monument Boxes, ensuring proper traffic management and installation quality throughout the county.

Work breakdown
  • Traffic control setup
  • Asphalt coring and cutting
  • Monument box installation
  • Asphalt patching
  • Incidental work as per specifications
Response package checklist
  • Company qualifications and experience
  • Detailed work plan addressing all components
  • Price proposal
  • Timeline for completion
  • Proof of relevant licensing and insurance
Suggested keywords
Survey Monument BoxesInstallationTraffic controlAsphalt servicesWashington County
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Complete details of the specifications
  • Exact number of monument boxes to be installed
  • Specific locations for installation within the county
  • Operational hours for construction work
  • Qualifications for subcontractors if required

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.