Skip to content
Washington County

100690-SW 205th Avenue-Baseline to Quatama Improvements

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-C03342-00016139
DepartmentWashington CountyAgencyC0334207 - Lut | C0334 - LutStateORPostedDueMar 18, 2026, 01:00 PM UTCCloses in 17 days

Federal opportunity from C0334207 - LUT | C0334 - LUT • Washington County. Place of performance: OR. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$69,940,410,012
Sector total $69,940,410,012 • Share 100.0%
Live
Median
$350,000
P10–P90
$29,356$12,502,188
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($69,940,410,012)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Sara Gates 1400 SW Walnut St., MS 18 Hillsboro, OR 97123 US Email: Sara_Gates@washingtoncountyor.gov Phone: (503) 846-7823
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 23, 2026
Oregon • Baker, Benton, Clackamas +33
Match signal: state match • county match
Published Jan 02, 2026
Oregon • Washington
Match signal: state match • county match
Published Jan 02, 2026
Oregon • Baker, Benton, Clackamas +33
Match signal: state match • county match
Published Jan 23, 2026
Oregon • Josephine
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Washington County
Agency
C0334207 - LUT | C0334 - LUT
Subagency
C0334207 - LUT | C0334 - LUT
Office
Sara Gates | Sara_Gates@washingtoncountyor.gov | (503) 846-7823
Contracting Office Address
Not available

Description

100690-SW 205th Avenue-Baseline to Quatama Improvements SW 205th Avenue Baseline to Quatama Improvements WASHINGTON COUNTY DEPARTMENT OF LAND USE & TRANSPORTATION INVITATION TO BID BID NO: 2026.028-LUT CPS THE PROJECT: The project name is: SW 205th Avenue Baseline to Quatama Improvements The work to be done under this contract will consist of the following in Washington County: 1. Implement temporary traffic control and temporary erosion control measures, 2. Perform earthwork, 3. Perform watermain, sanitary, and storm sewer work 4. Install retaining walls 5. Remove bridge #671327 6. Install new multispan bridge 7. Perform cold plane pavement removal 8. Perform traffic signal installation and modifications 9. Install illumination and interconnect systems 10. Construct aggregate base and asphalt concrete pavement, 11. Construct concrete curbs, gutters, sidewalks and ramps 12. Install permanent signing and striping 13. Install permanent seeding and landscaping 14. Construct water quality facilities 15. Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is $15,000,000 - $30,000,000 PRE-BID MEETING The County will not hold a pre-bid meeting for this Project. BIDS: Bids for SW 205th Avenue - Baseline to Quatama Improvements will be received electronically via the County's OpenGov Procurement Portal before 1:00 PM on Wednesday March 18, 2026, after which bids will be opened, and publicly read aloud via video conference on Microsoft Teams. A link to the meeting will be provided on the OpenGov Procurement website. All interested parties are invited to attend remotely via Microsoft Teams. Bids submitted after the above stated time will not be accepted. Bids must include:

  • A residency statement as defined in ORS 279C.365.
  • A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by

an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non -compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. BID DOCUMENTS: Bid documents will be available March 2, 2026 on the OpenGov Procurement website. Bid documents may be obtained only through the OpenGov Procurement website, at https://procurement.opengov.com/signup, free of charge. Paper copies of Bid Documents will not be made available for prospective bidders. Addenda, Plans Holders List, Preliminary Bid Results, and Notice of Intent to Award, will be posted on the OpenGov Procurement website. Addenda will ONLY be made available on the OpenGov Procurement website. BIDDERS: Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026, effective on or before date and time of the bid opening. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the County in these bid documents. Otherwise, the bid may be rejected as non- responsive. Bidders must conform to the requirements of these B id Documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the OpenGov Procurement website prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit the First -tier Subcontractors Disclosure Form provided, either with the B id, or using a separate, linked solicitation on the OpenGov Procurement site. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). First Tier Subcontractors Disclosure forms submitted by email, by fax, or in person, will not be accepted. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. THE COUNTY: The County reserves the right to waive any irregularities or informalities. Plan Holder’s List and Bid Results: Information regarding plan holder lists and bid results will only be available on the OpenGov Procurement website. Questions: Submit questions only in writing on the County's OpenGov Procurement Portal with the Question/Answer feature on the project page. https://procurement.opengov.com/portal/washington-county-or Replies to these questions will be posted on the County portal as well. PROJECT STAFF WILL ONLY RESPOND TO QUESTIONS SUBMITTED IN WRITING. Project Contacts: Jason Kivett, Project Manager 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 971-470-9325 Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-969-7990 Published: March 2, 2026 OpenGov Procurement Daily Journal of Commerce OregonBuys

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 02, 2026
Executive summary

The SW 205th Avenue Baseline to Quatama Improvements project in Washington County is a significant infrastructure effort with an estimated cost between $15 million and $30 million. Key tasks include replacing a bridge, performing earthwork, and installing water and sewer systems. Bids are due by March 18, 2026, with electronic submissions through the County's OpenGov Procurement Portal.

What the buyer is trying to do

The buyer aims to improve infrastructure along SW 205th Avenue by upgrading transportation and utility systems, including the removal and installation of bridges and earthwork.

Work breakdown
  • Implement temporary traffic control and erosion control measures
  • Perform earthwork
  • Conduct watermain, sanitary, and storm sewer work
  • Install retaining walls
  • Remove bridge #671327 and install a new multispan bridge
  • Perform cold plane pavement removal
  • Install traffic signals and modifications
  • Install illumination and interconnect systems
  • Construct aggregate base and asphalt concrete pavement
  • Construct concrete curbs, gutters, sidewalks, and ramps
Response package checklist
  • Complete bid documents available on the OpenGov Procurement website
  • Include residency statement as defined in ORS 279C.365
  • Provide a bid bond, irrevocable letter of credit, certified check, or cashier's check of at least 10% of the total bid
  • Comply with public works wage requirements
  • Submit First-tier Subcontractors Disclosure Form
Suggested keywords
Infrastructure improvementsBridge installationPublic works biddingTraffic control measuresWashington County construction
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Exact start and end dates for the period of performance
  • Information regarding any required bond amounts beyond the 10% stipulated
  • Detailed drawings or plans for the project improvements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.