2024.110 ITB New Charging Stations Provide and Install
Federal opportunity from C0034210 - Fleet Services | C0301 - Fleet Services • Washington County. Place of performance: OR. Response deadline: Nov 13, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2024.110 ITB New Charging Stations Provide and Install
This post is for advertisement purposes only. Go to the Washington County Solicitation portal at www.washcopurch.com/biz for full details and to respond to the solicitation.
Washington County soliciting bids for provision and installation of new ChargePoint electric vehicle charging stations. The County already has ChargePoint stations and does not want any other brand or type so no substitutions will be entertained. Respondents must be able procure the units from ChargePoint, install the units, and provide any necessary warranty work. Contractor will also be requred to assist the with completing and submitting the necessary paperwork to receive availlable grants or funds from Oregon Department of Transportation (ODOT), Portland General Electric (PGE), or other sources.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.