RFP - Aquatic Construction Services - Coffee Creek Aquatic Organism Passage Project
Federal opportunity from R3414001 - Contracts and Procurement | 001 - Contracts and Procurement • Tualatin Soil & Water Conservation District. Place of performance: OR. Response deadline: Apr 15, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Proposers shall submit a signed Responsibility Inquiry form. District will determine if an apparent successful Proposer is Responsible prior to award and execution of the Contract/Price Agreement. Culvert Removal and Bridge Installation. Bridge has been ordered by the district, abutments are cast-in-place. Re-align stream channel and install Constructed Riffle as shown in project layout and design. Bank Stabilization - Install toe wood and soil lifts as indicated in the project layout and design
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.