Skip to content
Salem Area Mass Transit District-Cherriots

Electric Gate Installation

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KS2410-00014810
DepartmentSalem Area Mass Transit District-CherriotsStateORPostedDueSep 10, 2025, 03:00 PM UTCExpired

Federal opportunity from Salem Area Mass Transit District-Cherriots. Place of performance: OR. Response deadline: Sep 10, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,206,283,725
Sector total $7,206,283,725 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,015,226
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,206,283,725)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Salem Area Mass Transit District-Cherriots
Agency
Not available
Subagency
Not available
Office
Kim Leeker
Contracting Office Address
Not available

Description

Electric Gate Installation

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 28, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Salem Area Mass Transit District-Cherriots is seeking contractors for electric gate installation as outlined in opportunity ID S-KS2410-00014810. Responses are due by September 10, 2025, making this an opportunity for experienced vendors in gate installation. As there are no specific NAICS codes listed, bidders should ensure compliance with general contracting standards.

electric gate installationsecurity gatesCherriots transitcontracting opportunities
What the buyer is trying to do

Install electric gates to enhance security and accessibility at transit facilities.

Who should pursue this
  • Specialized contractors in electric gate systems
  • Businesses with previous experience in similar installations
  • Companies located near Salem to minimize transportation costs
Work breakdown
  • Site assessment for gate installation
  • Procurement of electric gate systems
  • Installation of electric gates
  • Testing and commissioning of gate systems
  • Post-installation support and maintenance planning
Response package checklist
  • Company profile and experience
  • Proposed approach and timeline
  • Cost proposal
  • References from previous projects
  • Compliance certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all installations meet local building codes
  • Follow safety regulations and guidelines specific to electrical installations
Pricing strategy
  • Consider competitive pricing to secure bid while maintaining quality
  • Include costs for any necessary permits or inspections
Teaming and subs
  • Partnership with electrical engineers for compliance oversight
  • Subcontract with local labor if needed
Risks and watchouts
  • Delays in permitting may affect installation timelines
  • Changes in local regulations on installations may impact project scope
Smart questions to ask
  • What specific security features are desired for the gates?
  • Are there existing site plans or drawings available for reference?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work specifications
  • Existing infrastructure details
  • Budget range for the project
  • Potential site visit opportunities
  • Preferred brands or specifications for electric gates
  • Local regulations specifics
  • Contact information for the agency
  • Evaluation criteria for submitted bids

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.