Electric Gate Installation
Federal opportunity from KS241001 - Procurement | KS241 - Procurement • Salem Area Mass Transit District-Cherriots. Place of performance: OR. Response deadline: Sep 01, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Electric Gate Installation Bidders are directed to review Appendix - Electrical Drawing C1 and Appendix C2 Gate Map Locations. SAMTD requires, at a minimum, the below project phases: Kick-Off Meeting, A&E Documents, Construction, Operational Plan and Implementation Schedule, Safety Plan, Testing, Staff Training/Materials, As-Built Drawings, Buy America Post Audit and Contract Maintenance. A&E Documents, Construction, Operational Plan and Implementation Schedule, Safety Plan, Testing, Staff Training/Materials, As-Built Drawings, Buy America Post Audit and Contract Maintenance. Electric Hardware Conduit Gates
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.