RFP 22-021 Design, Engineering, & NEPA Plan Services For South Salem Transit Center
Federal opportunity from Salem Area Mass Transit District-Cherriots. Place of performance: OR. Response deadline: Aug 01, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
RFP 22-021 Design, Engineering, & NEPA Plan Services For South Salem Transit Center
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Salem Area Mass Transit District-Cherriots is seeking proposals for RFP 22-021, aimed at providing design, engineering, and NEPA plan services for the South Salem Transit Center. The deadline for responses is set for August 1, 2022, which underscores the urgency and importance of timely submissions. Teams with experience in transportation infrastructure projects and compliance with NEPA regulations will be well positioned to compete for this opportunity.
The buyer aims to obtain comprehensive design and engineering services, along with the necessary NEPA documentation, for the development of the South Salem Transit Center.
- Architectural and engineering firms with NEPA experience.
- Consultants specializing in transit-oriented design.
- Conduct site analyses and feasibility studies.
- Develop architectural designs and engineering plans.
- Prepare NEPA documentation for environmental compliance.
- Completed proposal document.
- Evidence of past performance on similar projects.
- NEPA compliance documentation.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Firms must adhere to NEPA guidelines throughout the project.
- Ensure all designs meet state transit standards.
- Consider competitive pricing reflecting market standards for similar design and engineering services.
- Detail cost breakdown for each phase of work outlined in the proposal.
- Partner with local civil engineering firms for technical expertise.
- Collaborate with environmental consultants to ensure NEPA compliance.
- Failure to meet NEPA compliance may lead to project delays.
- Potential challenges in navigating local zoning regulations.
- What is the expected timeline for project approvals?
- Are there specific community stakeholders involved that we should engage with?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget constraints for the project.
- Detailed timeline for each phase of the project.
- Contact information for project leads at Salem Area Mass Transit.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.