Skip to content
Reynolds School District

REYNOLDS SCHOOL DISTRICT DESIGN BUILD (DB) PROJECT

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P26004-00015034
DepartmentReynolds School DistrictStateORPostedDueSep 29, 2025, 02:30 PM UTCExpired

Federal opportunity from Reynolds School District. Place of performance: OR. Response deadline: Sep 29, 2025.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260056 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Jackson
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+33 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 33 more rate previews.
Davis-BaconBest fitstate match
OR20260056 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+32 more occupation rates in this WD
Davis-Baconstate match
OR20260103 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson, Josephine
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
TILE FINISHER
Base $32.68Fringe $16.48
+27 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Reynolds School District
Agency
Not available
Subagency
Not available
Office
Renee Saechao
Contracting Office Address
Not available

Description

REYNOLDS SCHOOL DISTRICT DESIGN BUILD (DB) PROJECT

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Reynolds School District is soliciting bids for a Design Build (DB) project, with a response deadline set for September 29, 2025, at 2:30 PM GMT. This presents a significant opportunity for firms specializing in construction and design services. Interested bidders should familiarize themselves with the specific requirements of school district projects in Oregon to maximize their chances of success.

Design BuildReynolds School DistrictConstructionOregonEducational Facilities
What the buyer is trying to do

The Reynolds School District aims to engage a qualified firm to handle the design and construction aspects of a new project to enhance educational facilities.

Who should pursue this
  • Construction firms with experience in education-related projects
  • Architectural and engineering service providers
  • Firms with a proven track record in Oregon school district projects
  • Companies that can demonstrate sustainable practices in construction
Work breakdown
  • Project design specification development
  • Construction management and oversight
  • Collaboration with Reynolds School District stakeholders
  • Compliance with local regulations and standards
  • Quality assurance throughout the project lifecycle
Response package checklist
  • Completed proposal documents
  • Proof of relevant certifications and experience
  • Project timelines and milestones
  • Cost estimate and pricing strategy
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to Oregon construction laws and regulations is crucial.
  • Ensure inclusion of sustainable building practices if required by the district.
Pricing strategy
  • Competitive pricing is critical, given the public nature of the bidding process.
  • Consider including a contingency budget for potential unforeseen costs.
Teaming and subs
  • Consider partnering with local subcontractors to enhance community support.
  • Collaborate with engineering firms for comprehensive design services.
Risks and watchouts
  • Underestimating project scope could lead to financial overruns.
  • Potential delays in approvals or permits from the school district.
  • Inadequate understanding of local regulations could result in compliance issues.
Smart questions to ask
  • What are the specific design requirements set by the Reynolds School District?
  • Are there existing plans or studies that the chosen firm should review?
  • What is the budget range set aside for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work is not provided.
  • No information on pre-proposal meetings or site visits is available.
  • Specific project budget is not mentioned.
  • Lack of attachment details or supplementary documents for bidders.
  • Timeline for design approvals remains unspecified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.