Skip to content
Reynolds School District

REYNOLDS SCHOOL DISTRICT DESIGN BUILD (DB) PROJECT

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P26004-00015034
DepartmentReynolds School DistrictStateORPostedDueSep 29, 2025, 02:30 PM UTCExpired

Federal opportunity from Reynolds School District. Place of performance: OR. Response deadline: Sep 29, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
Reynolds School District
Agency
Not available
Subagency
Not available
Office
Renee Saechao
Contracting Office Address
Not available

Description

REYNOLDS SCHOOL DISTRICT DESIGN BUILD (DB) PROJECT

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Executive summary

The Reynolds School District is soliciting bids for a Design Build (DB) project, with a response deadline set for September 29, 2025, at 2:30 PM GMT. This presents a significant opportunity for firms specializing in construction and design services. Interested bidders should familiarize themselves with the specific requirements of school district projects in Oregon to maximize their chances of success.

What the buyer is trying to do

The Reynolds School District aims to engage a qualified firm to handle the design and construction aspects of a new project to enhance educational facilities.

Work breakdown
  • Project design specification development
  • Construction management and oversight
  • Collaboration with Reynolds School District stakeholders
  • Compliance with local regulations and standards
  • Quality assurance throughout the project lifecycle
Response package checklist
  • Completed proposal documents
  • Proof of relevant certifications and experience
  • Project timelines and milestones
  • Cost estimate and pricing strategy
  • References from similar projects
Suggested keywords
Design BuildReynolds School DistrictConstructionOregonEducational Facilities
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work is not provided.
  • No information on pre-proposal meetings or site visits is available.
  • Specific project budget is not mentioned.
  • Lack of attachment details or supplementary documents for bidders.
  • Timeline for design approvals remains unspecified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.