Skip to content
Portland Community College

Moving, Installation, De-Installation and Storage Services

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P26801-00006506
DepartmentPortland Community CollegeStateORPostedDueMay 22, 2023, 02:00 PM UTCExpired

Federal opportunity from Portland Community College. Place of performance: OR. Response deadline: May 22, 2023.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,206,283,725
Sector total $7,206,283,725 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,015,226
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,206,283,725)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Portland Community College
Agency
Not available
Subagency
Not available
Office
Juanita Lognion
Contracting Office Address
Not available

Description

Moving, Installation, De-Installation and Storage Services

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves providing Moving, Installation, De-Installation, and Storage Services for Portland Community College. The response deadline is set for May 22, 2023. This contract represents a chance for service providers specializing in logistical support to engage with an educational institution.

Moving ServicesInstallation ServicesStorage SolutionsLogistics Support
What the buyer is trying to do

Portland Community College aims to engage a contractor that can efficiently manage moving, installation, de-installation, and storage tasks to facilitate campus operations and relocations.

Who should pursue this
  • Companies with experience in moving and logistical services
  • Firms that specialize in higher education logistics
  • Contractors equipped with necessary resources (vehicles, staff, storage facilities)
Work breakdown
  • Assessing the scope of moving and storage requirements
  • Coordinating the logistics of installation and de-installation
  • Providing storage solutions for college materials and equipment
Response package checklist
  • Company background and experience
  • Detailed approach to moving and storage
  • Pricing structure
  • References from similar contracts
  • Proof of insurance and bonding
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all services comply with relevant safety regulations
  • Maintain adherence to contractual obligations
Pricing strategy
  • Consider competitive pricing while ensuring sustainability of service quality
  • Potential for bulk service discounts based on volume
Teaming and subs
  • Local moving companies
  • Logistics and warehousing firms
  • Specialized equipment handling services
Risks and watchouts
  • Potential logistic disruptions during peak academic periods
  • Need for clear communication with college administration
Smart questions to ask
  • What is the expected volume of moving services annually?
  • Are there specific timelines for major installations?
  • What are the college's critical operational periods that we should accommodate?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific requirements or restrictions for bidders
  • Details on the volume or frequency of moves needed
  • Evaluation criteria for bids
  • Clarification on the scope for installation and de-installation services
  • Relevant historical data on previous service contracts
  • Specific types of items to be moved or stored
  • Insider contacts at Portland Community College
  • Information on whether there are existing contracts

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.