9 Acre Lot Grading Project
Federal opportunity from R2168902 - Administration | R2168 - Administration • Port of Newport. Place of performance: OR. Response deadline: Mar 02, 2026.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 30 more rate previews.↓
Point of Contact
Agency & Office
Description
9 Acre Lot Grading Project
The Port of Newport undertaking a grading project to compact and level the 9 acre heavy industrial zoned lot at McLean Point to make the property maintainable in anticipation of future projects. The finished product will be a relatively level field, seeded with grass that can be mowed regularly to be maintained.
The Port of Newport undertaking a grading project to compact and level the 9 acre heavy industrial zoned lot at McLean Point to make the property maintainable in anticipation of future projects. The finished product will be a relatively level field, seeded with grass that can be mowed regularly to be maintained. Scope of Work: Provide all labor, material, tools, lift equipment, supervision (min one company employed, full time foreman), submittals, manuals and incidentals necessary to complete all work implied by the attached scope of work you are quoting. Any deviations taken by bidder to the terms, conditions, plans, specifications, codes, etc of this RFQ shall be clearly stated and included as an attachment to the Bid Form. Schedule for Work: May 1, 2026, to July 24, 2026. Time is of the essence. All attempts at improving the schedule shall be made by the contractor
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Port of Newport is issuing a Request for Quotation (RFQ) for a 9 Acre Lot Grading Project aimed at leveling and compacting a heavy industrial zoned lot at McLean Point. The project demands completion by July 24, 2026, with a clear focus on maintaining the area for future projects. This initiative includes providing all necessary labor, materials, and equipment, emphasizing the importance of a full-time foreman overseeing the operations.
The buyer aims to prepare a 9-acre industrial lot for maintainability by grading the land, making it suitable for regular mowing and future developments.
- Construction companies with experience in land grading
- Companies with expertise in industrial zoning compliance
- Contractors capable of managing heavy equipment and labor teams
- Site preparation and grading
- Compaction of soil to ensure stability
- Seeding the area with grass for maintenance
- Provision of all labor, tools, and supervision
- Compliance with specifications and codes outlined in the RFQ
- Completed Bid Form
- Detailed scope of work proposal
- Clear statement of any deviations from RFQ terms
- References from previous grading projects
- Proof of insurance and bonding
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adhere to all specified codes and regulations outlined in the RFQ
- Include any required permits for grading and seeding
- Document any deviations from standard practices in the bid
- Consider costs for labor, equipment, and materials
- Account for potential delays and equipment rental fees
- Include margin for unexpected site conditions
- Consider partnering with local landscaping companies for seeding
- Engage equipment rental firms for additional resources
- Seek subcontractors specialized in soil compaction
- Possible site conditions that may complicate grading
- Delays in project timeline due to weather or equipment failures
- Inadequate supervision could lead to compliance issues
- What specific soil conditions are expected on-site?
- Are there any environmental considerations for grading and seeding?
- What is the process for handling unexpected site conditions?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for grading methods
- Clarification of penalties for delays beyond schedule
- List of codes and regulations to follow
- Anticipated site conditions or challenges
- More specific bidding forms or formats required
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.