ITB New Walk-In Cooler for the Cove Palisades State Park
Federal opportunity from Oregon Parks and Recreation Department. Place of performance: OR. Response deadline: Sep 09, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB New Walk-In Cooler for the Cove Palisades State Park
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The State of Oregon's Parks and Recreation Department is seeking bids for the procurement of a new walk-in cooler specifically for the Cove Palisades State Park. The response deadline for this Invitation to Bid (ITB) is set for September 9, 2022. This opportunity presents a focused project that requires expertise in commercial refrigeration solutions suitable for state park facilities.
The Oregon Parks and Recreation Department aims to replace or install a new walk-in cooler to support food storage and preservation needs at Cove Palisades State Park.
- Businesses specializing in commercial refrigeration
- Contractors with experience in park or outdoor facility installations
- Companies familiar with state or government procurement processes
- Assess site requirements for cooler installation
- Design specifications for the walk-in cooler
- Procurement of materials and installation services
- Testing of the new cooler's functionality
- Training park staff on cooler operation
- Completed bid form
- Detailed product specifications of the cooler
- Company qualifications and experience
- References from similar projects
- Warranty information and service terms
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with Oregon state procurement laws
- Follow all safety and operational regulations for installation
- Consider competitive pricing due to potential local competition
- Include options for maintenance contracts after the initial sale
- Subcontracting opportunities for electrical or plumbing works
- Partnerships with local supply vendors for parts
- Delay in delivery leading to project timeline issues
- Potential permit or zoning complications with installation
- Inaccurate specifications leading to project cost overruns
- What are the specific size and capacity requirements for the cooler?
- Are there any existing infrastructure considerations at the park?
- What are the expectations for post-installation support and warranty?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific dimensions or capacity of the cooler required
- Detailed installation timeline
- Budget range for the project
- Any specific brands or models preferred
- Maintenance requirements post-installation
- Permitting requirements for installation
- Existing infrastructure details
- Scope of work related to site preparation
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.