Skip to content
Oregon Parks and Recreation Department

ITB 9002 2022 Paving Improvements at Collier Memorial State Park

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-63400-00002680
DepartmentOregon Parks and Recreation DepartmentStateORPostedDueApr 26, 2022, 02:00 PM UTCExpired

Federal opportunity from Oregon Parks and Recreation Department. Place of performance: OR. Response deadline: Apr 26, 2022.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260001 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
OR20260001 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
Piledriver
Base $55.79Fringe $15.81
+45 more occupation rates in this WD
Davis-Baconstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Oregon Parks and Recreation Department
Agency
Not available
Subagency
Not available
Office
Melody Waight
Contracting Office Address
Not available

Description

ITB 9002 2022 Paving Improvements at Collier Memorial State Park

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 03, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Oregon Parks and Recreation Department is seeking bids for the ITB 9002 2022 Paving Improvements at Collier Memorial State Park, with a response deadline of April 26, 2022. This project focuses on enhancing the park's infrastructure to improve accessibility and visitor experience. Bidders should be prepared to demonstrate relevant experience in similar paving projects.

paving improvementsCollier Memorial State ParkOregon Parks and Recreationpublic worksconstruction bid
What the buyer is trying to do

Improve paving and infrastructure at Collier Memorial State Park to better serve visitors and enhance accessibility.

Who should pursue this
  • Construction companies with experience in paving
  • Engineering firms specializing in park infrastructure
  • Local contractors familiar with Oregon regulations
Work breakdown
  • Assessment of current paving conditions
  • Preparation of project specifications
  • Execution of paving improvements
  • Post-completion inspection and reporting
Response package checklist
  • Company qualifications and experience
  • Project timeline and approach
  • Detailed pricing proposal
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with Oregon state regulations
  • Adhere to local labor laws
  • Follow safety standards for public works projects
Pricing strategy
  • Consider competitive local pricing
  • Factor in material costs and labor
  • Incorporate potential contingencies for unforeseen issues
Teaming and subs
  • Local subcontractors for paving materials
  • Partnerships with engineering firms
  • Collaboration with environmental consultants for park considerations
Risks and watchouts
  • Potential delays due to weather conditions
  • Budget overruns if not properly estimated
  • Meeting timeline requirements for permit approvals
Smart questions to ask
  • What specific paving materials are preferred or required?
  • Are there any environmental considerations to take into account?
  • What is the evaluation criteria for the bids?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Exact scope of paving improvements
  • Budget estimate for the project
  • Specific materials needed for paving
  • Project timeline details
  • Requirements for bid submission format
  • List of relevant permits needed
  • Performance and warranty requirements
  • Available plans or designs for reference

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.