ITB 9002 2022 Paving Improvements at Collier Memorial State Park
Federal opportunity from Oregon Parks and Recreation Department. Place of performance: OR. Response deadline: Apr 26, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB 9002 2022 Paving Improvements at Collier Memorial State Park
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Oregon Parks and Recreation Department is seeking bids for the ITB 9002 2022 Paving Improvements at Collier Memorial State Park, with a response deadline of April 26, 2022. This project focuses on enhancing the park's infrastructure to improve accessibility and visitor experience. Bidders should be prepared to demonstrate relevant experience in similar paving projects.
Improve paving and infrastructure at Collier Memorial State Park to better serve visitors and enhance accessibility.
- Construction companies with experience in paving
- Engineering firms specializing in park infrastructure
- Local contractors familiar with Oregon regulations
- Assessment of current paving conditions
- Preparation of project specifications
- Execution of paving improvements
- Post-completion inspection and reporting
- Company qualifications and experience
- Project timeline and approach
- Detailed pricing proposal
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with Oregon state regulations
- Adhere to local labor laws
- Follow safety standards for public works projects
- Consider competitive local pricing
- Factor in material costs and labor
- Incorporate potential contingencies for unforeseen issues
- Local subcontractors for paving materials
- Partnerships with engineering firms
- Collaboration with environmental consultants for park considerations
- Potential delays due to weather conditions
- Budget overruns if not properly estimated
- Meeting timeline requirements for permit approvals
- What specific paving materials are preferred or required?
- Are there any environmental considerations to take into account?
- What is the evaluation criteria for the bids?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact scope of paving improvements
- Budget estimate for the project
- Specific materials needed for paving
- Project timeline details
- Requirements for bid submission format
- List of relevant permits needed
- Performance and warranty requirements
- Available plans or designs for reference
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.