Public Notice for Sole Source Determination - InVeris Range Interface and Target Uprgrades
Federal opportunity from 24803 - Camp Rilea | AGI-C - Camp Rilea • Oregon Military Department. Place of performance: OR. Response deadline: Sep 15, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
Public Notice for Sole Source Determination - InVeris Range Interface and Target Uprgrades
The State of Oregon, acting by and through its Oregon Military Department, intends to issue a Purchase Order to InVeris Training Solutions for Range Interface and Target System Upgrades for the Machine Gun Transition Range at Camp Rilea Armed Forces Training Center.
Proprietary Range Interface and Target System Upgrades for Machine Gun (MG) Transition Range system at Camp Rilea Armed Forces Training Center.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The State of Oregon intends to issue a Purchase Order for proprietary Range Interface and Target System Upgrades at the Machine Gun Transition Range within Camp Rilea Armed Forces Training Center. The sole source determination targets InVeris Training Solutions as the exclusive provider for these upgrades. This notice outlines a significant opportunity for ongoing enhancement of military training capabilities.
The Oregon Military Department seeks to upgrade the Range Interface and Target System specifically for the Machine Gun Transition Range to improve training efficiency and effectiveness.
- InVeris Training Solutions
- Companies with experience in military training equipment.
- Identify the specifications needed for the Range Interface and Target upgrades.
- Assessment of current system capabilities at Camp Rilea.
- Coordinate with InVeris Training Solutions for customization needs.
- Proof of proprietary rights to the products being offered.
- Technical specifications of proposed upgrades.
- Experienced personnel resumes relevant to the project.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- All submissions must demonstrate compliance with military procurement standards.
- Vendors must adhere to state procurement regulations.
- Consider the cost of proprietary technology against potential training enhancements.
- Pricing should reflect value-added services and ongoing support.
- Partner with local contractors to support installation and maintenance services.
- Potential alliances with other tech providers for integrated solutions.
- Limited competitive bidding may raise concerns about pricing and quality assurance.
- Dependency on the sole source may affect future upgrade flexibility.
- What are the technical specifications required by the Oregon Military Department for these upgrades?
- What are the expected timelines for delivery and implementation of the new systems?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific pricing details provided.
- Details on the current system's performance metrics are lacking.
- The exact scope of upgrades required is not specified.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.