Camp Rilea Maneuver Grounds RV Style Dump/Fill station.
Federal opportunity from Oregon Military Department. Place of performance: OR. Response deadline: Jan 18, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
Camp Rilea Maneuver Grounds RV Style Dump/Fill station.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Oregon Military Department is seeking bids for the construction of an RV style dump/fill station at Camp Rilea Maneuver Grounds. This project represents a critical infrastructure upgrade for managing wastewater disposal for RV users on the site. Bids are due by January 18, 2023, marking an important date for potential contractors to prepare their proposals.
The Oregon Military Department aims to improve facilities at Camp Rilea Maneuver Grounds by constructing an RV style dump/fill station to enhance waste management capabilities for visitors and operations.
- Contractors with experience in civil engineering projects
- Firms specializing in wastewater management systems
- Local contractors familiar with Oregon regulations
- Site preparation and grading
- Installation of dump/fill station infrastructure
- Connection to existing utilities
- Compliance with environmental regulations
- Final inspection and testing
- Cover letter
- Technical proposal detailing approach
- Detailed cost estimate
- List of relevant experience
- Compliance with Oregon construction standards
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Needs to meet Oregon Department of Transportation specifications
- Must comply with local environmental regulations
- Consider local material costs and labor rates
- Include contingencies for unexpected expenditures
- Provide a clear breakdown of fixed and variable costs
- Partner with local environmental engineers for regulatory compliance
- Interface with suppliers for waste management solutions
- Team up with civil construction specialists
- Potential delays due to environmental assessments
- Challenges in coordinating with existing utility services
- Risk of cost overruns if site conditions are not well understood
- What environmental regulations should we prioritize during construction?
- Are there existing utility maps available for review?
- What is the anticipated timeline for site access and construction approvals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific budget or funding details provided
- Lack of detailed project specifications
- No clarity on required licensing or certifications for bidders
- Absence of performance metrics or evaluation criteria
- Unspecified warranty or maintenance requirements
- No available historical data on similar projects
- No described stakeholder engagement process
- Missing information on site location specifics
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.