River Bend County Park Bank Restoration
Federal opportunity from Oregon Department of Fish and Wildlife. Place of performance: OR. Response deadline: Sep 14, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
River Bend County Park Bank Restoration
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Oregon Department of Fish and Wildlife posted an opportunity titled “River Bend County Park Bank Restoration,” with a response deadline of 2022-09-14T15:00:00+00:00. The notice description repeats the title and provides no additional scope, performance location, or technical requirements. Given the limited information, bidders should first obtain the full solicitation package and confirm whether this is a streambank/riverbank stabilization and habitat restoration project or another type of “bank restoration.” Without attachments or a solicitation number, initial capture should focus on identifying the procurement vehicle and mandatory site conditions before investing in detailed pricing.
Procure services for “River Bend County Park Bank Restoration” for the Oregon Department of Fish and Wildlife, likely involving restoration of a bank area within River Bend County Park (specific bank type and work elements not provided).
- Firms with demonstrated bank restoration project experience relevant to ODFW’s needs, once scope and location are confirmed.
- Environmental restoration contractors capable of field work in park settings (pending confirmation of requirements).
- Confirm scope definition of “bank restoration” (e.g., river/stream bank stabilization, erosion control, habitat restoration) from the full solicitation.
- Site understanding: identify exact location within River Bend County Park and access constraints (not provided).
- Permitting/environmental compliance requirements (not provided).
- Construction/restoration execution (methods, materials, and schedule not provided).
- Post-restoration monitoring, as-builts, and closeout deliverables (not provided).
- Obtain and follow the complete solicitation instructions (not provided in the notice).
- Confirm required forms, certifications, and bid/proposal format (not provided).
- Technical approach describing how you will deliver “bank restoration” at River Bend County Park (scope details needed).
- Project schedule aligned to buyer constraints (period of performance not provided).
- Pricing/cost proposal per solicitation structure (not provided).
- Past performance on similar bank restoration projects (specific evaluation criteria not provided).
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Deadline: 2022-09-14T15:00:00+00:00 (ensure submission method/time zone requirements are confirmed in the full solicitation).
- No attachments, solicitation number, NAICS/PSC, set-aside, or place of performance are provided in the notice—compliance requirements cannot be validated from this brief alone.
- Do not finalize pricing until the full scope (quantities, design vs. build responsibility, materials, access, disposal, and restoration standards) is obtained.
- If the solicitation reveals uncertain subsurface/erosion conditions, consider a pricing structure that clearly separates known work from allowances/contingencies if permitted by the procurement (structure not provided).
- Depending on the final scope, consider teaming with specialty bank stabilization/habitat restoration subcontractors (e.g., bioengineering installation) once requirements are known.
- If monitoring or environmental documentation is required, consider an environmental consulting sub to support reporting (requirements not provided).
- Scope ambiguity: the notice provides only the title/description, creating high risk of mis-scoping and mispricing.
- Unknown site conditions and access constraints within River Bend County Park could drive means/methods and cost, but are not provided.
- Unknown permitting/environmental constraints (often material in restoration work) are not stated in the notice.
- Administrative risk: missing solicitation number, links, and attachments may indicate additional steps to locate the official bid documents before responding.
- Where is the exact place of performance within River Bend County Park, and what is being restored (river/stream bank, lake bank, or other)?
- Is this design-bid-build (plans/specs provided) or does the contractor provide design/engineering as part of restoration?
- What are the required restoration outcomes and acceptance criteria (e.g., stabilization performance, vegetation establishment, habitat targets)?
- What permits/approvals are required, and who is responsible for obtaining them (ODFW vs. contractor)?
- Are there constraints on in-water work windows, seasonal limitations, or park/public access requirements?
- What is the required submittal method and exact closing time/time zone confirmation for the 2022-09-14T15:00:00+00:00 deadline?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Full solicitation document/instructions and submission method
- Place of performance and site location details
- Detailed scope of work and technical specifications
- Solicitation number and procurement type (ITB/RFP/etc.)
- Period of performance and schedule constraints
- Evaluation criteria and required bidder qualifications
- Plans/drawings, quantities, and any geotechnical/hydraulic information
- Permitting/environmental compliance responsibilities
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.