ITB-2425-117 HVAC Addition at the Annex Project
Federal opportunity from P030101 - Purchasing | P0301 - Business Operations • North Clackamas School District. Place of performance: OR. Response deadline: Mar 27, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB-2425-117 HVAC Addition at the Annex Project The North Clackamas School District requests bids for the HVAC Addition Project at the Professional Development Center at the Annex as specified in the Invitation to Bid. The contractor will be responsible for supplying and installing an 8.5-ton heat pump package for the building's multipurpose room and a 2-ton heat pump mini split system for the office. All permitting, electrical, concrete, and fencing work to be included as on the Bid Documents.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.