Skip to content
Mt Hood Community College

Parking Lots Tree Trenches

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P00400-00006484

Federal opportunity from P0040003 - Business Office | P0040 - Business Office • Mt Hood Community College. Place of performance: OR. Response deadline: May 16, 2023.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,203,828,782
Sector total $7,203,828,782 • Share 100.0%
Live
Median
$96,677
P10–P90
$28,298$1,600,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,203,828,782)
Deal sizing
$96,677 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Mejdi Mahjoub 26000 SE Stark St Gresham, OR 97030 US Email: Phone: (503) 491-6085
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Mt Hood Community College
Agency
P0040003 - Business Office | P0040 - Business Office
Subagency
P0040003 - Business Office | P0040 - Business Office
Office
Mejdi Mahjoub | Phone: | (503) 491-6085
Contracting Office Address
Not available

Description

Parking Lots Tree Trenches

Retrofit on 4 parking lots near the Yoshida Sports Complex. Existing asphalt will be removed, underlying soil excavated, and then soil and mulch will be added (and eventually trees; separate from this contract) to treat stormwater from the parking lot. Project will be performed as specified on the construction documents and the specifications included in this ITB. See attached for more details.

Retrofit on 4 parking lots near the Yoshida Sports Complex. Existing asphalt will be removed, underlying soil excavated, and then soil and trees will be added to treat stormwater from the parking lot. Project will be performed as specified on the construction documents and the specifications included in this ITB.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.