Skip to content
Molalla River School District

RFP E-Rate Category 2 Internal Connections

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P03035-00015295
DepartmentMolalla River School DistrictStateORPostedDueDec 11, 2025, 04:00 PM UTCExpired

Federal opportunity from Molalla River School District. Place of performance: OR. Response deadline: Dec 11, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
Carpenters: Including Form Work-Multi Unit
Base $36.27Fringe $14.03
Rate
Including Form Work-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Molalla River School District
Agency
Not available
Subagency
Not available
Office
Katie Piatkoff
Contracting Office Address
Not available

Description

RFP E-Rate Category 2 Internal Connections

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Molalla River School District is seeking proposals for E-Rate Category 2 Internal Connections through RFP S-P03035-00015295. The response deadline is set for December 11, 2025. This RFP may involve providing necessary internal connections to enhance network infrastructure within the district.

E-RateInternal ConnectionsNetwork InfrastructureMolalla River School DistrictEducational Technology
What the buyer is trying to do

The buyer aims to improve network capabilities within the Molalla River School District through the procurement of internal connections that align with the E-Rate program requirements.

Who should pursue this
  • Companies with experience in E-Rate projects
  • Firms specializing in network infrastructure
  • Local or regional contractors familiar with educational institutions
Work breakdown
  • Evaluate current internal network infrastructure
  • Detail the proposed solutions for internal connections
  • Include a maintenance and support plan
  • Outline project timeline and milestones
Response package checklist
  • Completed proposal documents
  • Detailed project plan
  • Pricing breakdown
  • Company qualifications and relevant experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with E-Rate program regulations
  • Adhere to all local and state procurement laws
Pricing strategy
  • Investigate competitive pricing aligned with similar projects
  • Consider long-term cost-efficiency and scalability in pricing
Teaming and subs
  • Partner with technology firms experienced in E-Rate implementations
  • Consider subcontracting for specialized installation services
Risks and watchouts
  • Potential changes in E-Rate funding or regulations
  • Delays in project timeline due to unforeseen circumstances
  • Competition from larger, established firms
Smart questions to ask
  • What specific internal connection types are prioritized by the district?
  • Are there any existing contracts or vendors involved that we should be aware of?
  • What are the success metrics for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific internal connection requirements detailed
  • Lack of established budget or funding limits
  • Absence of evaluation criteria for proposals
  • No information on current infrastructure status
  • Unclear whether there are preferred vendors in mind

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.