RFP - Santiam Rail Trail
Federal opportunity from C2510203 - Public Works | C2510 - Public Works • Marion County. Place of performance: OR. Response deadline: Apr 16, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
RFP - Santiam Rail Trail Request for Proposals to obtain Proposals from qualified consultant(s) for land survey, conceptual analysis and design, draft environmental studies, right of way determination, preliminary engineering, design and related services for the Santiam Rail Trail project. Engineering Consulting Services Environmental Consulting Professional Services Civil Engineering Traffic and Transportation
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.