ITB - Construction of Asphalt Concrete Resurfacing of Various Marion County Roads
Federal opportunity from C2510203 - Public Works | C2510 - Public Works • Marion County. Place of performance: OR. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB - Construction of Asphalt Concrete Resurfacing of Various Marion County Roads Invitation to Bid for the construction of asphalt concrete resurfacing of various Marion County roads as called for in the Plans and Specifications and such additional Incidental Work as requested by the Engineer. The estimated project cost range is $3,000,000 to $5,000,000. MARKERS, PLAQUES AND TRAFFIC CONTROL DEVICES DELINEATORS, GUARD RAIL, TRIANGULAR SHAPED, PLASTIC, ADHESIVE TYPE Traffic Control Devices Crushed Stone (Includes Rip Rap) Paving/Resurfacing, Highway and Road
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This Invitation to Bid (ITB) seeks contractors for the construction of asphalt concrete resurfacing on various roads in Marion County, with an estimated project cost of $3,000,000 to $5,000,000. Interested bidders are required to adhere to the Plans and Specifications, including incidental work as directed by the Engineer. The bid deadline is set for March 19, 2026, presenting a timely opportunity for qualified firms specializing in roadway construction and resurfacing.
The Public Works agency of Marion County aims to enhance road safety and longevity by resurfacing various roads, thereby improving infrastructure for local traffic and increasing the overall road quality in the area.
- Review and understand the provided Plans and Specifications.
- Prepare bid documents, including costs and timelines.
- Conduct site assessments if necessary prior to bidding.
- Submit bids by the March 19, 2026, deadline.
- Completed bid form as per ITB instructions.
- Detailed cost breakdown for all phases of construction.
- Proof of relevant experience and successful project completions.
- Timeline for project execution and completion.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed Plans and Specifications for review are not provided in the brief.
- Specific requirements for traffic control devices were not outlined.
- No past project performance requirements specified in the notice.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.