ITB for Construction of 1st Floor at 3180 Center St
Federal opportunity from Marion County. Place of performance: OR. Response deadline: Aug 28, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB for Construction of 1st Floor at 3180 Center St
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Marion County is soliciting bids for the construction of the first floor at 3180 Center St as outlined in the Invitation to Bid (ITB) notice S-C25102-00014424. The response deadline for submissions is set for August 28, 2025, making it crucial for interested parties to prepare adequately. This project requires firms with construction capabilities specifically for commercial or municipal environments.
Marion County aims to select a qualified contractor to carry out construction activities on the first floor of a specified location, ensuring compliance with local codes and standards.
- General contractors with experience in commercial construction
- Companies with relevant local licenses
- Firms specializing in municipal projects
- Demolition of existing structures on the 1st floor
- Construction of new walls and rooms
- Installation of electrical and plumbing systems
- Interior finishing work
- Completed bid form
- Proof of licensing and bonding
- Project experience documentation
- Proposed timeline for completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local building codes
- Verify adherence to safety standards during construction
- Consider bid pricing based on competitive market rates within Marion County
- Account for potential material and labor cost fluctuations
- Consider partnering with local subcontractors for specialized services
- Evaluate joint ventures with firms holding relevant experience
- Possible delays due to permit approvals
- Budget overruns if material costs rise
- Challenges in meeting project timelines due to unforeseen conditions
- What are the specific requirements for permits and inspections?
- Are there any historical considerations or restrictions for the property?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific funding details for the project
- Estimated budget range for the construction
- Detailed scope of work requirements
- Any existing blueprints or architectural plans for reference
- Information about site conditions and previous assessments
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.