ITB - Construction of Rambler Dr SE: Little Pudding River Bridge Project Structures
Federal opportunity from Marion County. Place of performance: OR. Response deadline: Apr 19, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB - Construction of Rambler Dr SE: Little Pudding River Bridge Project Structures
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Marion County has issued an ITB titled “Construction of Rambler Dr SE: Little Pudding River Bridge Project Structures,” indicating a low-bid, construction-focused procurement. The bid response deadline is 2024-04-19 14:00 UTC. The title suggests a bridge structures effort associated with Rambler Dr SE and the Little Pudding River, likely emphasizing structural construction work. Because the notice brief contains only the title and deadline, bidders should immediately obtain the full ITB package and confirm bid form requirements, bonding, and site conditions before committing to bid.
Procure a contractor via an Invitation to Bid (ITB) to construct the “Rambler Dr SE: Little Pudding River Bridge” project structures for Marion County.
- Heavy civil contractors with demonstrated bridge/structures construction experience (bridge structures scope implied by the project title)
- Firms positioned to compete on low-bid ITB procurements with strong estimating and subcontractor coverage for structural work
- Review full ITB documents for the Rambler Dr SE: Little Pudding River Bridge project structures scope
- Bid preparation as a construction ITB (quantity takeoff, means/methods plan, subcontractor quotes)
- Bridge/structures construction execution per the ITB requirements (structures portion of the project)
- Completed ITB bid form(s) and pricing schedule(s) as required in the solicitation package
- Acknowledgment of any addenda issued prior to the 2024-04-19 14:00 UTC deadline
- Bid security and bonding documents if required by the ITB (confirm in the full package)
- Required certifications/representations and any bidder responsibility forms included in the ITB
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- This is an ITB; ensure the bid is responsive (correct forms, signatures, and timely submission by 2024-04-19 14:00 UTC) once submission instructions are confirmed in the ITB documents
- Treat as a low-bid environment: prioritize accurate quantity takeoff and subcontractor pricing for structures work
- Use bid/no-bid after verifying all cost drivers in the ITB (traffic control, access constraints, environmental or in-water work restrictions, concrete/steel specs) since none are provided in the brief
- Line up bridge/structures specialty subs and suppliers aligned to the project structures scope (confirm exact trades once ITB is obtained)
- Insufficient information in the notice brief to confirm full scope, constraints, and bid requirements—high risk of nonresponsive bid without the full ITB package
- Bridge/river-associated work can carry significant schedule and constructability risks; confirm any restrictions and sequencing requirements in the ITB documents before finalizing price
- Where is the complete ITB package (plans/specs, bid schedule, and submission instructions) for “Rambler Dr SE: Little Pudding River Bridge Project Structures”?
- What are the exact bid submission requirements for responsiveness (forms, signatures, bid bond amount, and delivery method) and what is the time zone governing the 2024-04-19 14:00 deadline?
- Are there addenda anticipated, and how will bidders be notified and required to acknowledge them?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Link/location for the full ITB package (plans, specs, bid forms, addenda)
- Solicitation number
- Place of performance and site details
- Engineer’s estimate / bid items and quantities
- Bonding and insurance requirements
- Bid submission method (electronic vs. hard copy) and governing time zone
- Pre-bid meeting/site walk schedule (if any)
- Project schedule/period of performance
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.