ITB for Timber Bridge Fumigation Services
Federal opportunity from Marion County. Place of performance: OR. Response deadline: May 05, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 36 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB for Timber Bridge Fumigation Services
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Marion County is seeking bids for Timber Bridge Fumigation Services through invitation to bid (ITB) S-C25102-00002806. This opportunity requires specialized knowledge in fumigation techniques relevant to timber structures. The response deadline is set for May 5, 2022, which necessitates prompt action for interested bidders.
The buyer aims to contract a service provider for fumigating timber bridges to protect against pests and ensure structural integrity.
- Fumigation specialists
- Contractors with experience in pest control for timber
- Companies with certifications in pesticide application
- Assessment of timber structures
- Application of fumigants
- Safety protocols during fumigation
- Post-fumigation inspection
- Completed bid form
- Company qualifications
- Proposed fumigation methods
- Safety plans and certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with local environmental regulations
- Adhere to safety standards for chemical handling
- Consider industry standards for fumigation services
- Include cost of materials and safety equipment
- Potential for competitive pricing based on urgency
- Partner with pest control professionals if lacking expertise
- Consider subcontractors for safety compliance
- Potential regulatory changes affecting fumigation practices
- Challenges in sourcing environmentally friendly fumigants
- Delays due to weather impacting service timeline
- Are there specific pests or conditions to focus on?
- What are the safety requirements during fumigation?
- What is the expected timeframe for project completion?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on the fumigation methods required
- Specific safety certifications needed
- Historical data on previous fumigation results
- Any preference for environmentally friendly products
- Estimated number of bridges requiring service
- Location of the timber bridges involved
- Budget range for the project
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.