CR2101 - ITB North River Drive Public Improvement (Range 0-5M)
Federal opportunity from C0151004 - Road Dept. | ROAD - Road Dept. • Linn County. Place of performance: OR. Response deadline: Apr 21, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
CR2101 - ITB North River Drive Public Improvement (Range 0-5M) Class of Work - A) Asphalt Concrete Paving & Oiling, or B) the combination of 1) Miscellaneous Highway Appurtenances & 2) Temporary Traffic Control
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
C0151004 - Road Dept. | ROAD - Road Dept. issued solicitation CR2101 - ITB North River Drive Public Improvement (Range 0-5M), with . CR2101 - ITB North River Drive Public Improvement (Range 0-5M) Class of Work - A) Asphalt Concrete Paving & Oiling, or B) the combination of 1) Miscellaneous Highway Appurtenances & 2) Temporary Traffic Control The record currently includes 1 linked source attachment for review.
CR2101 - ITB North River Drive Public Improvement (Range 0-5M) Class of Work - A) Asphalt Concrete Paving & Oiling, or B) the combination of 1) Miscellaneous Highway Appurtenances & 2) Temporary Traffic Control
- Solicitation contractors with direct experience delivering comparable work for public buyers.
- CR2101 - ITB North River Drive Public Improvement (Range 0-5M)
- Review 1 linked source document.
- Download and review all official solicitation documents and addenda.
- Confirm submission format, due date, and delivery method with the buyer portal or notice.
- Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Validate insurance, licensing, and any site-access requirements in the official documents.
- Price to the actual scope and staffing assumptions in the official documents.
- Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
- Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
- Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
- Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
- Due date is Apr 21, 2026; verify exact due time and timezone.
- Do not assume unstated requirements, contract duration, or evaluation factors.
- Are there mandatory site visits, staffing minimums, or licensing requirements?
- What exact documents and forms must be submitted at bid time?
- Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Set-aside status is not confirmed.
- Contracting office/contact is not clearly identified.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.