RFQ - Pre-Level and 2 Inch Asphalt Overlay
Federal opportunity from C0151004 - Road Dept. | ROAD - Road Dept. • Linn County. Place of performance: OR. Response deadline: Apr 10, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
RFQ - Pre-Level and 2 Inch Asphalt Overlay
PRE-LEVEL AND 2 INCH ASPHALT OVERLAY
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves an RFQ for Pre-Level and a 2 Inch Asphalt Overlay issued by the Oregon Road Department, with a response deadline set for April 10, 2025. The requirement focuses on specific asphalt overlay tasks that are crucial for roadway maintenance. Interested bidders must ensure they can meet the technical specifications outlined in the associated documents.
The Oregon Road Department is seeking qualified contractors to perform a Pre-Level and 2 Inch Asphalt Overlay on designated roadways to improve their condition and safety.
- Asphalt paving contractors
- Construction firms with experience in roadway maintenance
- Companies equipped to handle large scale pavement projects
- Review RFQ specifications and requirements in detail.
- Prepare technical proposal addressing all outlined tasks.
- Develop pricing strategy for the asphalt materials and labor.
- Outline project timeline and resource allocation.
- Submit bid by the specified deadline.
- Completed technical proposal
- Pricing breakdown
- Company qualifications and past performance
- References from similar projects
- Acknowledgement of RFQ terms
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bidders must ensure compliance with local and state environmental regulations related to asphalt work.
- Contractors must have liability insurance and necessary licenses to operate in Oregon.
- Consider material costs associated with asphalt and potential fluctuating prices.
- Calculate labor costs based on project scope and duration estimates.
- Partner with materials suppliers for competitive bulk pricing.
- Consider teaming with engineering firms for enhanced proposal strength.
- Potential for cost overruns due to unexpected site conditions.
- Delay in bid submissions could result in missed deadlines.
- Non-compliance with procurement guidelines may lead to disqualification.
- What are the specific locations and conditions of the roads needing overlay?
- Are there any preferred suppliers for asphalt materials?
- What is the anticipated start date for the project upon award?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed technical specifications for the asphalt overlay work.
- Names of relevant points of contact for clarifications.
- Estimated budget range for the project.
- Scope of work locations and specific conditions.
- Any pre-bid meeting schedule or requirements.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.