Skip to content
Lane County Government

ITB: Convention Center Door Replacement

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-C00200-00005760
DepartmentLane County GovernmentStateORPostedDueMar 14, 2023, 10:00 AM UTCExpired

Federal opportunity from Lane County Government. Place of performance: OR. Response deadline: Mar 14, 2023.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Lane County Government
Agency
Not available
Subagency
Not available
Office
Ashleigh Riolo
Contracting Office Address
Not available

Description

ITB: Convention Center Door Replacement

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

Lane County Government is seeking bids for the Convention Center Door Replacement project (ITB: S-C00200-00005760), with a response deadline set for March 14, 2023. This project aims to enhance facility security and accessibility. Vendors interested in this opportunity should prepare detailed proposals that align with the project's specifications and requirements.

door replacementconstruction bidpublic sector procurementLane CountyADA compliance
What the buyer is trying to do

The buyer is looking to replace the doors at the Convention Center in order to improve security and accessibility for visitors and staff.

Who should pursue this
  • General contractors with experience in building renovations
  • Specialized suppliers in door manufacturing
  • Local contractors familiar with public sector projects
Work breakdown
  • Assess current door conditions
  • Develop specifications for new doors
  • Procure materials for door installation
  • Install new doors according to specifications
  • Conduct follow-up inspections and adjustments
Response package checklist
  • Completed bid form
  • Specifications of proposed doors
  • Proof of prior work relevant to door installations
  • Insurance and bonding information
  • Timeline for completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All bids must comply with local building codes
  • Vendors must meet ADA accessibility requirements
Pricing strategy
  • Consider competitive pricing based on local market rates
  • Account for potential material cost fluctuations
  • Offer favorable payment terms to the county
Teaming and subs
  • Subcontractors specializing in door systems
  • Local suppliers for door materials
  • Consultants for ADA compliance
Risks and watchouts
  • Delays in material procurement
  • Compliance with ADA standards
  • Weather impacting installation timelines
Smart questions to ask
  • What specific types of doors are required?
  • Is there a preferred vendor for materials?
  • Are there any existing issues with building codes?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific technical specifications for the doors
  • Budget or funding limits for the project
  • Any existing contractual obligations with suppliers
  • Details on current door types and conditions
  • Type of warranty or guarantee expected
  • Local contractor regulations or requirements
  • Potential penalties for delays
  • History of similar past projects

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.