Skip to content
Eugene School District 4J

Awbrey Park Elementary School HVAC Upgrades Project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P20004-00016304

Federal opportunity from P2000402 - Facilities | P2000 - Facilities • Eugene School District 4J. Place of performance: OR. Response deadline: Mar 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,092,954,764
Sector total $7,092,954,764 • Share 100.0%
Live
Median
$226,501
P10–P90
$30,957$1,270,186
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,092,954,764)
Deal sizing
$226,501 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Eugene School District 4J
Agency
P2000402 - Facilities | P2000 - Facilities
Subagency
P2000402 - Facilities | P2000 - Facilities
Office
Diana McElhinney
Contracting Office Address
Not available

Description

Awbrey Park Elementary School HVAC Upgrades Project Briefly, the work is described as: The project involves replacing the chiller system and making selected HVAC modifications inside the Gym/Cafeteria building. Beginning Thursday, March 12, 2026 Prime Bidders, Sub-bidders and Suppliers may obtain bidding documents at the following hyperlink: http://www.4j.lane.edu./bids/. Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. Please see Addendum No. 1 at https://www.4j.lane.edu/bids Please see Addendum No. 2 at https://www.4j.lane.edu/bids Please see Addendum No. 3 at https://www.4j.lane.edu/bids

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Awbrey Park Elementary School HVAC Upgrades Project seeks contractors for the replacement of the chiller system and modifications to the HVAC within the Gym/Cafeteria building. Bidding documents will be available starting March 12, 2026, and must be obtained online. This project falls under the jurisdiction of the Oregon Facilities agency, and bids are due by March 26, 2026.

HVAC upgradesChiller replacementSchool constructionEnergy efficiencyBid documents
What the buyer is trying to do

The buyer is looking for contractors to efficiently replace an outdated chiller system and upgrade the HVAC setup for the comfort and efficiency of the Gym/Cafeteria in Awbrey Park Elementary School.

Who should pursue this
  • Contractors specializing in HVAC upgrades
  • Mechanical engineers with experience in school facilities
  • Firms with local project references
Work breakdown
  • Replacement of chiller system
  • HVAC modifications in Gym/Cafeteria
  • Document procurement and compliance with bidding processes
Response package checklist
  • Completed bid form
  • Proof of relevant past projects
  • Bid security documentation if required
  • Company qualifications and capabilities
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All bidders must adhere to state contracting regulations.
  • Obtain documents and addenda from specified hyperlink only.
Pricing strategy
  • Consider a competitive price based on local HVAC market rates.
  • Account for potential fluctuation in material costs due to supply chain issues.
Teaming and subs
  • Subcontractors specializing in electrical and plumbing as part of HVAC work.
  • Local suppliers for HVAC equipment and materials.
Risks and watchouts
  • Potential delays due to late procurement of bidding documents.
  • Risk of increased material costs because of economic conditions.
  • Ensure compliance with all state regulations for educational institutions.
Smart questions to ask
  • What is the timeline for school operations during the installation?
  • Are there specific energy efficiency standards we need to meet?
  • What is the process for submitting questions regarding the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget range for the project
  • Detailed scope of HVAC modifications
  • Specific timeline for project completion
  • Any required certifications for bidders
  • Information on previous projects of similar scope
  • Local subcontractor requirements
  • Potential implications for school operations during work
  • Economic factors affecting material costs

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.