South Eugene High School Window Abatement Phase 3 - RE-BID
Federal opportunity from P2000402 - Facilities | P2000 - Facilities • Eugene School District 4J. Place of performance: OR. Response deadline: Mar 04, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
South Eugene High School Window Abatement Phase 3 - RE-BID
Briefly, the work is described as: Abatement of a portion of existing exterior windows at South Eugene High School.
Beginning February 23, 2026, Prime Bidders, Sub-bidders and Suppliers may obtain bidding documents at the following hyperlink: http://www.4j.lane.edu./bids/. Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This is a re-bid for “South Eugene High School Window Abatement Phase 3,” covering abatement of a portion of existing exterior windows at South Eugene High School. The bid package is available online only (no hard copies) via http://www.4j.lane.edu./bids/ starting February 23, 2026, and bidders are responsible for obtaining all bidding documents and addenda from that link. Responses are due March 4, 2026 at 14:00 UTC. The opportunity appears suited to licensed abatement contractors experienced with school occupied-site constraints and exterior window abatement sequencing.
Engage a contractor to perform abatement associated with a portion of existing exterior windows at South Eugene High School (Phase 3), using the school district’s issued bidding documents and addenda distributed via the district website.
- Download and review bidding documents/addenda from http://www.4j.lane.edu./bids/ (available starting 2026-02-23)
- Plan and execute abatement for a portion of existing exterior windows at South Eugene High School (Phase 3)
- Coordinate any required sub-bidders/suppliers aligned to abatement means/methods reflected in the bid documents
- Comply with all administrative bidding requirements contained in the district’s online bid package (since hard copies are not provided)
- Completed bid submission per the district’s bidding documents downloaded from http://www.4j.lane.edu./bids/
- Acknowledgment of all addenda obtained from the hyperlink (as required by the bid documents)
- Abatement-related licensing/credentials and any sub-bidder/supplier documentation required by the bid package
- Bid form(s) and any required bonds/insurance forms as specified in the online bidding documents
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Full bidding documents/addenda contents (scope details, quantities, required forms, bonds/insurance, site constraints) from the district link
- Solicitation number and notice type
- Place of performance address/location details beyond the school name
- Period of performance / project schedule requirements beyond bid-doc availability date
- Applicable NAICS/PSC and any set-aside or eligibility constraints
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.