Multi-Site Slurry Sealing Project
Federal opportunity from P2000402 - Facilities | P2000 - Facilities • Eugene School District 4J. Place of performance: OR. Response deadline: Jan 22, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Multi-Site Slurry Sealing Project Briefly, the work involves slurry sealing sections of pavement at various school sites to extend its longevity, along with reinstalling striping to improve visibility and overall safety. There is limited full depth asphalt replacement at Buena Vista Elementary School. Beginning December 31, 2025, Prime Bidders, Sub-bidders and Suppliers may obtain bidding documents at the following hyperlink: http://www.4j.lane.edu./bids/. Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Multi-Site Slurry Sealing Project by the Oregon Facilities Agency requires the slurry sealing of pavement across various school sites, starting December 31, 2025. This project aims to extend the longevity of pavement and includes striping work to enhance safety. Note that there is limited full depth asphalt replacement specifically at Buena Vista Elementary School.
The buyer intends to maintain and improve the condition of school infrastructure through slurry sealing and striping, enhancing safety and longevity of pavement.
- Slurry sealing sections of pavement at multiple school sites
- Reinstalling striping for improved visibility
- Limited full depth asphalt replacement at Buena Vista Elementary School
- Completed bid form
- Proof of similar project experience
- Insurance and bonding documentation
- List of subcontractors and suppliers
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location of all school sites involved
- Detailed specifications for the slurry sealing process
- Scope of work for limited asphalt replacement at Buena Vista Elementary
- Clarification on whether pre-bid meetings will be held
- Information on potential bidder assistance or Q&A sessions
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.