RFQ for Architectural Services for Design of Replacement of windows at South Eugene HS
Federal opportunity from Eugene School District 4J. Place of performance: OR. Response deadline: Jul 07, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 36 more rate previews.↓
Point of Contact
Agency & Office
Description
RFQ for Architectural Services for Design of Replacement of windows at South Eugene HS
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Eugene School District 4J aims to solicit architectural services for the design of new windows at South Eugene High School, as outlined in RFQ S-P20004-00014151. The response deadline for this opportunity is set for July 7, 2025. This project presents a targeted opportunity for specialized firms looking to contribute to public educational infrastructure.
The buyer is seeking qualified architectural firms to provide design services specifically for the replacement of windows at South Eugene High School, ensuring compliance with relevant standards and enhancing the school's facilities.
- Architectural firms with experience in educational facility design
- Companies with proven track record in window replacement projects
- Firms able to demonstrate compliance with local regulations
- Analyze existing window conditions
- Develop design proposals for window replacement
- Ensure compliance with building codes
- Prepare construction documentation
- Cover letter expressing interest
- Firm qualifications and experience
- Design approach and methodologies
- Cost estimate and pricing strategy
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local and state building codes
- Verify compliance with educational facility standards
- Consider competitive pricing based on previous similar projects
- Include detailed breakdown of design services costs
- Consider teaming with local contractors for implementation phases
- Potential for small business partnerships to meet diversity goals
- Changes in building regulations could impact designs
- Potential delays in project approval processes
- Budget constraints affecting final design choices
- What specific outcomes does the district expect from the window replacement project?
- Are there any existing standards or materials the district prefers?
- What is the timeline for design approval and project execution?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed specifications for window types or design requirements
- Absence of budget range for the project
- No information on required qualifications or contractor licensing standards
- Lack of information on the existing window conditions
- Unclear if there are any environmental or sustainability goals
- No stated project timeline or milestones leading up to completion
- Details regarding evaluation criteria for bids are missing
- No information on local economic opportunities or compliance factors
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.