Skip to content
Eugene School District 4J

RFQ for Architectural Services for Design of Replacement of windows at South Eugene HS

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P20004-00014151
DepartmentEugene School District 4JStateORPostedDueJul 07, 2025, 12:00 PM UTCExpired

Federal opportunity from Eugene School District 4J. Place of performance: OR. Response deadline: Jul 07, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,224,878,180
Sector total $7,224,878,180 • Share 100.0%
Live
Median
$252,161
P10–P90
$30,957$1,428,923
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,224,878,180)
Deal sizing
$252,161 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260080 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +5
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
+36 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 36 more rate previews.
Davis-BaconBest fitstate match
OR20260080 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +5
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $63.50Fringe $29.73
+35 more occupation rates in this WD
Davis-Baconstate match
OR20260009 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +4
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
Carpenters: Including Form Work-Multi Unit
Base $36.27Fringe $14.03
Rate
Including Form Work-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Eugene School District 4J
Agency
Not available
Subagency
Not available
Office
Diana McElhinney
Contracting Office Address
Not available

Description

RFQ for Architectural Services for Design of Replacement of windows at South Eugene HS

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Eugene School District 4J aims to solicit architectural services for the design of new windows at South Eugene High School, as outlined in RFQ S-P20004-00014151. The response deadline for this opportunity is set for July 7, 2025. This project presents a targeted opportunity for specialized firms looking to contribute to public educational infrastructure.

Architectural ServicesWindow ReplacementSouth Eugene High SchoolRFQEugene School District
What the buyer is trying to do

The buyer is seeking qualified architectural firms to provide design services specifically for the replacement of windows at South Eugene High School, ensuring compliance with relevant standards and enhancing the school's facilities.

Who should pursue this
  • Architectural firms with experience in educational facility design
  • Companies with proven track record in window replacement projects
  • Firms able to demonstrate compliance with local regulations
Work breakdown
  • Analyze existing window conditions
  • Develop design proposals for window replacement
  • Ensure compliance with building codes
  • Prepare construction documentation
Response package checklist
  • Cover letter expressing interest
  • Firm qualifications and experience
  • Design approach and methodologies
  • Cost estimate and pricing strategy
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local and state building codes
  • Verify compliance with educational facility standards
Pricing strategy
  • Consider competitive pricing based on previous similar projects
  • Include detailed breakdown of design services costs
Teaming and subs
  • Consider teaming with local contractors for implementation phases
  • Potential for small business partnerships to meet diversity goals
Risks and watchouts
  • Changes in building regulations could impact designs
  • Potential delays in project approval processes
  • Budget constraints affecting final design choices
Smart questions to ask
  • What specific outcomes does the district expect from the window replacement project?
  • Are there any existing standards or materials the district prefers?
  • What is the timeline for design approval and project execution?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No detailed specifications for window types or design requirements
  • Absence of budget range for the project
  • No information on required qualifications or contractor licensing standards
  • Lack of information on the existing window conditions
  • Unclear if there are any environmental or sustainability goals
  • No stated project timeline or milestones leading up to completion
  • Details regarding evaluation criteria for bids are missing
  • No information on local economic opportunities or compliance factors

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.