Churchill High School Gym and STEM Re-roof
Federal opportunity from P2000402 - Facilities | P2000 - Facilities • Eugene School District 4J. Place of performance: OR. Response deadline: Mar 12, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Churchill High School Gym and STEM Re-roof Briefly, the work is described as (re-roofing at the Churchill High School Gym and STEM building roof areas. This includes the demolition of existing roofing and installation of new TPO membrane roofing with R-30 insulation, the addition of fall protection elements, and replacement of roof hatches.) Beginning February 14, 2024 Prime Bidders, Sub-bidders and Suppliers may obtain bidding documents at the following hyperlink: https://www.4j.lane.edu/30394_2. Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. Addendum 01 posted at: https://www.4j.lane.edu/30394_2 Addendum 02 posted at: https://www.4j.lane.edu/30394_2 Addendum 03 is posted here: https://4j.lane.edu/30394_2
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.