Skip to content
Department of Transportation

The Dalles MS New Overhead Doors

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-73000-00016325

Federal opportunity from 7304610 - Facilities | 0924 - Facilities Const • Department of Transportation. Place of performance: OR. Response deadline: Apr 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Facilities Const 63055 N Hwy 97, Bldg. B Bend, OR 97701 US Email: odotfacbranchinvoices@odot.oregon.gov Phone: (503) 986-5777
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260001 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
OR20260001 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
Piledriver
Base $55.79Fringe $15.81
+45 more occupation rates in this WD
Davis-Baconstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
7304610 - Facilities | 0924 - Facilities Const
Subagency
7304610 - Facilities | 0924 - Facilities Const
Office
David Dethloff | Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 | odotfacbranchinvoices@odot.oregon.gov | (503) 986-5777
Contracting Office Address
Not available

Description

The Dalles MS New Overhead Doors Removal of existing overhead doors and operators, installation of new overhead doors and operators. Possibly painting of doors that are not selected for replacement and miscellaneous items as indicated in the contract documents. Bidders are required to provide bid/pricing on all items listed including items 1-5. Base Bid - Remove 4 existing overhead doors and operators and replace with new overhead doors and operators at overhead doors 3, 4, 5, and 6 in accordance with the attached plans and specifications. Add Alternate #1 - Remove existing 12' wide overhead door and operator and replace with new overdead door and operator. Price is per each, from 1 to 3 total. Priority order of door replacement is 13, 12, 11. Add Alternate #2 - Remove existing 14' wide overhead door and operator and replace with new overhead door and opwerator in accordance with the attached plans and specifications. Price is PER EACH, from 1 to 2 total. Proiority order of door replacement is door 7 and then 8. Add alternate #3 - Remove existing 12' wide overhead door and operator and replace with new overhead door and operator. Price is per each, from 1 to 3 total. Priority order of door replacement is 14, 1 and 2. Add Alternate #4 - Prepare and paint exisiting overhead door. Price is PER EACH, from 1 to 7 total. Priority order of door painting is door 1, 2, 3, 7, 8, 14, 9, 10, 11, 12 and then 13. The intent of this alternate is to ensure any doors that dont get replaced may be able to get painted white to match the new doors. (if it fits in the budget)

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Dalles MS is seeking bids for the removal and replacement of existing overhead doors, with a response deadline of April 2, 2026. This project includes multiple add alternates for additional door replacements and the preparation and painting of existing doors not selected for replacement, aiming to ensure they visually match new installations. Bidders must provide pricing for all listed items, including base and alternate bids as specified in the contract documents.

overhead doors installationcommercial door replacementpainting servicescontract biddingbuilding maintenance
What the buyer is trying to do

The buyer aims to modernize overhead doors at The Dalles MS by replacing older units and potentially refurbishing existing ones to maintain aesthetic consistency.

Who should pursue this
  • General contractors with experience in commercial door installations.
  • Subcontractors specializing in overhead door systems.
  • Companies that can provide painting services as well.
Work breakdown
  • Remove 4 existing overhead doors and operators.
  • Install new overhead doors and operators for doors 3, 4, 5, and 6.
  • Add alternate #1: Replace a 12' wide overhead door and operator.
  • Add alternate #2: Replace a 14' wide overhead door and operator.
  • Add alternate #3: Replace another 12' wide overhead door and operator.
  • Add alternate #4: Prepare and paint existing overhead doors.
Response package checklist
  • Complete pricing for all base items and alternates.
  • Submit relevant qualifications and experience documentation.
  • Include liability insurance and bonding information.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local building codes for door installations.
  • Follow safety and environmental regulations during project execution.
Pricing strategy
  • Consider unit pricing for add alternates to remain competitive.
  • Review material costs for both new doors and painting to accurately bid.
  • Provide bundled pricing options for potential cost savings.
Teaming and subs
  • Consider partnering with local suppliers for overhead door materials.
  • Engage subcontractors for painting if not performed in-house.
  • Form alliances with installation specialists for efficiency.
Risks and watchouts
  • Potential delays in lead times for overhead door materials.
  • Budget limitations impacting the number of doors that can be painted.
  • Weather conditions affecting the timing of outdoor work.
Smart questions to ask
  • What are the specific specifications for the new overhead doors?
  • Can we receive clarification on the priority order for replacements?
  • Are there specific brands or types of doors preferred?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on the exact specifications for new overhead doors.
  • Cost estimates for painting and if there's a budget cap.
  • Whether any site restrictions may affect work access.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.