Skip to content
Department of Transportation

OR 82: Wallowa to Joseph Culvert Repair Project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-73000-00016170

Federal opportunity from 7304625 - Procurement | 0954 - OPO Oper & Constructn • Department of Transportation. Place of performance: OR. Response deadline: Apr 16, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for OR
Live POP
Place of performance
Region 5 3014 Island Ave La Grande, OR 97850 US Email: ODOT.OregonBuys@odot.oregon.gov Phone: (111) 111-1111
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260056 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Jackson
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+33 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 33 more rate previews.
Davis-BaconBest fitstate match
OR20260056 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+32 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
Carpenters: Including Form Work-Multi Unit
Base $36.27Fringe $14.03
Rate
Including Form Work-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
7304625 - Procurement | 0954 - OPO Oper & Constructn
Subagency
7304625 - Procurement | 0954 - OPO Oper & Constructn
Office
David Dethloff | Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 | ODOT.OregonBuys@odot.oregon.gov | (111) 111-1111
Contracting Office Address
Not available

Description

OR 82: Wallowa to Joseph Culvert Repair Project Work consists of supplying the materials, equipment, labor, and incidentals required to perform tasks as described in the contract plans and specifications including work zone traffic control, construct temporary water management facility as needed, clean and CCTV multiple culverts, install multiple CIPP liners, and perform additional work as called for by the contract plans and specifications or as directed. Culvert repair project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

7304625 - Procurement | 0954 - OPO Oper & Constructn issued solicitation OR 82: Wallowa to Joseph Culvert Repair Project, with . OR 82: Wallowa to Joseph Culvert Repair Project Work consists of supplying the materials, equipment, labor, and incidentals required to perform tasks as described in the contract plans and specifications including work zone traffic control, construct temporary water management facility as needed, clean and CCTV multiple culverts, install multiple CIPP liners, and perform additional work as called for by the contract plans and specifications or as directed. Culvert repair project

OR 82: Wallowa to Joseph Culvert Repair Project7304625 - Procurement | 0954 - OPO Oper & Constructn
What the buyer is trying to do

OR 82: Wallowa to Joseph Culvert Repair Project Work consists of supplying the materials, equipment, labor, and incidentals required to perform tasks as described in the contract plans and specifications including work zone traffic control, construct temporary water management facility as needed, clean and CCTV multiple culverts, install multiple CIPP liners, and perform additional work as called for by the contract plans and specifications or as directed. Culvert repair project

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
Work breakdown
  • OR 82: Wallowa to Joseph Culvert Repair Project
  • Review 5 linked source documents.
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is Apr 16, 2026; verify exact due time and timezone.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.