US101 MP352.6 - Lone Ranch Slide
Federal opportunity from 7304230 - Region 3 | 32001 - District 7 ADM/District 7 Manager - Epps • Department of Transportation. Place of performance: OR. Response deadline: Mar 17, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
US101 MP352.6 - Lone Ranch Slide Excavate and dispose of landslide material and native soil behind an existing rock inlay. Removal and reconstruction of the existing rock inlay, placement of stone embankment and the removal and replacement of the subsurface drain system. Work includes temporary work zone traffic control. TOTAL PROJECT COST
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.