2026 MIM I5 SB MP 301.13-300.89 Rut Repair
Federal opportunity from 7304220 - Region 1 | 12001 - Region 1 - PE Stubblefield • Department of Transportation. Place of performance: OR. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2026 MIM I5 SB MP 301.13-300.89 Rut Repair Contract requires Contractor furnish and place a ultra-high performance mortar (UHPM) and traffic control. Comply with the 2024 Oregon Standard Specifications for Construction. Total Project Bid: 2026 MIM I5 SB MP 301.13-300.89 Rut Repair
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The 2026 MIM I5 SB MP 301.13-300.89 Rut Repair project entails the furnishing and placement of ultra-high performance mortar (UHPM) along with traffic control measures, scheduled for a response deadline of March 10, 2026. Adherence to the 2024 Oregon Standard Specifications for Construction is mandated. Potential bidders should access relevant documentation through the provided links for detailed contractual requirements and specifications.
The buyer, Region 1 of the Oregon Department of Transportation, aims to rehabilitate a section of I5 by addressing ruts to improve roadway safety and functionality using ultra-high performance mortar.
- Assess existing rut conditions on I5 SB MP 301.13-300.89
- Furnish ultra-high performance mortar (UHPM)
- Place UHPM according to specifications
- Implement traffic control measures during construction
- Ensure compliance with 2024 Oregon Standard Specifications for Construction
- Completed bid form
- Proof of experience with similar construction projects
- Safety plan for traffic control
- Detailed pricing schedule
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific budget or estimated project cost provided
- No details on performance period outlined
- No clarification on how bids will be evaluated
- Lack of information on existing roadway conditions
- Absence of agency contact information for follow-up questions
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.