Skip to content
Department of Transportation

2026 MIM I5 SB MP 301.13-300.89 Rut Repair

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-73000-00016070

Federal opportunity from 7304220 - Region 1 | 12001 - Region 1 - PE Stubblefield • Department of Transportation. Place of performance: OR. Response deadline: Mar 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
North Portland 1100 N Columbia Blvd Portland, OR 97217 US Email: Shawn.STERKEN@odot.oregon.gov Phone: (971) 673-6105
State: OR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
7304220 - Region 1 | 12001 - Region 1 - PE Stubblefield
Subagency
7304220 - Region 1 | 12001 - Region 1 - PE Stubblefield
Office
Ivory Williams | Contact: Ivory Williams ivory.williams@odot.oregon.gov | Shawn.STERKEN@odot.oregon.gov | (971) 673-6105
Contracting Office Address
Not available

Description

2026 MIM I5 SB MP 301.13-300.89 Rut Repair Contract requires Contractor furnish and place a ultra-high performance mortar (UHPM) and traffic control. Comply with the 2024 Oregon Standard Specifications for Construction. Total Project Bid: 2026 MIM I5 SB MP 301.13-300.89 Rut Repair

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Executive summary

The 2026 MIM I5 SB MP 301.13-300.89 Rut Repair project entails the furnishing and placement of ultra-high performance mortar (UHPM) along with traffic control measures, scheduled for a response deadline of March 10, 2026. Adherence to the 2024 Oregon Standard Specifications for Construction is mandated. Potential bidders should access relevant documentation through the provided links for detailed contractual requirements and specifications.

What the buyer is trying to do

The buyer, Region 1 of the Oregon Department of Transportation, aims to rehabilitate a section of I5 by addressing ruts to improve roadway safety and functionality using ultra-high performance mortar.

Work breakdown
  • Assess existing rut conditions on I5 SB MP 301.13-300.89
  • Furnish ultra-high performance mortar (UHPM)
  • Place UHPM according to specifications
  • Implement traffic control measures during construction
  • Ensure compliance with 2024 Oregon Standard Specifications for Construction
Response package checklist
  • Completed bid form
  • Proof of experience with similar construction projects
  • Safety plan for traffic control
  • Detailed pricing schedule
Suggested keywords
ultra-high performance mortartraffic controlOregon Standard Specificationsroadway maintenancehighway repair
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget or estimated project cost provided
  • No details on performance period outlined
  • No clarification on how bids will be evaluated
  • Lack of information on existing roadway conditions
  • Absence of agency contact information for follow-up questions

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.