ESB - Hwy 333 Hermiston Hwy Crack Seal Project
Federal opportunity from 7304625 - Procurement | 0954 - OPO Oper & Constructn • Department of Transportation. Place of performance: OR. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ESB - Hwy 333 Hermiston Hwy Crack Seal Project Project is for supplying all labor, material, equipment, machinery, and traffic control for repairing and resealing cracks in flexible pavements in the designated state highway section in district 12. See all attached documents for details. Final awarded footage quantities may be adjusted to reflect ESB purchasing threshold. Hwy 333 Hermiston Hwy Crack Seal Projects, see specs in attachments. Bidding Linear Feet.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The ESB - Hwy 333 Hermiston Hwy Crack Seal Project offers an opportunity to provide comprehensive repair services including labor, materials, and traffic control specifically for flexible pavements. The work involves crack sealing on a designated stretch of state highway in district 12, highlighting the necessity of expertise in highway maintenance. Notably, the deadline for submission is set for March 3, 2026, providing ample time for thorough preparation and compliance with attached specifications.
The buyer intends to procure services for repairing and resealing cracks in the flexible pavements on Hwy 333 Hermiston, ensuring the longevity and safety of the road infrastructure in district 12.
- Supply labor for crack sealing and pavement repair.
- Provide necessary materials for the construction work.
- Manage traffic control to ensure safety during the project execution.
- Adjust final awarded footage quantities to reflect the ESB purchasing threshold.
- Bid proposal adhering to specifications in attachments.
- Cost breakdown by linear feet of crack sealing.
- List of relevant past projects and references.
- Proof of required licenses and certifications.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific funding amount for project not provided.
- Exact start and end dates of performance period are missing.
- Details about nearby road conditions during project execution.
- Information on any prior crack sealing operations in the area.
- Clarifications on how footage quantities will be measured.
- Contact information for agency representatives.
- Details regarding penalties for delays or non-compliance.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.