Skip to content
Department of Transportation

ESB - Hwy 333 Hermiston Hwy Crack Seal Project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-73000-00015895

Federal opportunity from 7304625 - Procurement | 0954 - OPO Oper & Constructn • Department of Transportation. Place of performance: OR. Response deadline: Mar 03, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Hermiston TMM 1840 S Highway 395 Hermiston, OR 97838 US Email: James.E.DAVISON@odot.oregon.gov Phone: (541) 278-8813 Alt. Reference: Kyle.HESS@odot.oregon.gov
State: OR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
7304625 - Procurement | 0954 - OPO Oper & Constructn
Subagency
7304625 - Procurement | 0954 - OPO Oper & Constructn
Office
David Dethloff | Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 | James.E.DAVISON@odot.oregon.gov
Contracting Office Address
Not available

Description

ESB - Hwy 333 Hermiston Hwy Crack Seal Project Project is for supplying all labor, material, equipment, machinery, and traffic control for repairing and resealing cracks in flexible pavements in the designated state highway section in district 12. See all attached documents for details. Final awarded footage quantities may be adjusted to reflect ESB purchasing threshold. Hwy 333 Hermiston Hwy Crack Seal Projects, see specs in attachments. Bidding Linear Feet.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Executive summary

The ESB - Hwy 333 Hermiston Hwy Crack Seal Project offers an opportunity to provide comprehensive repair services including labor, materials, and traffic control specifically for flexible pavements. The work involves crack sealing on a designated stretch of state highway in district 12, highlighting the necessity of expertise in highway maintenance. Notably, the deadline for submission is set for March 3, 2026, providing ample time for thorough preparation and compliance with attached specifications.

What the buyer is trying to do

The buyer intends to procure services for repairing and resealing cracks in the flexible pavements on Hwy 333 Hermiston, ensuring the longevity and safety of the road infrastructure in district 12.

Work breakdown
  • Supply labor for crack sealing and pavement repair.
  • Provide necessary materials for the construction work.
  • Manage traffic control to ensure safety during the project execution.
  • Adjust final awarded footage quantities to reflect the ESB purchasing threshold.
Response package checklist
  • Bid proposal adhering to specifications in attachments.
  • Cost breakdown by linear feet of crack sealing.
  • List of relevant past projects and references.
  • Proof of required licenses and certifications.
Suggested keywords
pavement repaircrack sealinghighway maintenancetraffic controlOregon highway
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific funding amount for project not provided.
  • Exact start and end dates of performance period are missing.
  • Details about nearby road conditions during project execution.
  • Information on any prior crack sealing operations in the area.
  • Clarifications on how footage quantities will be measured.
  • Contact information for agency representatives.
  • Details regarding penalties for delays or non-compliance.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.