Prineville MS - Reroof project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-73000-00015787

Federal opportunity from 7304610 - Facilities | 0924 - Facilities Const • Department of Transportation. Place of performance: OR. Response deadline: Feb 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$23,230,650,669
Sector total $23,230,650,669 • Share 100.0%
Live
Median
$151,906
P10–P90
$29,671$15,552,364
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($23,230,650,669)
Deal sizing
$151,906 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Facilities Const 63055 N Hwy 97, Bldg. B Bend, OR 97701 US Email: odotfacbranchinvoices@odot.oregon.gov Phone: (503) 986-5777
State: OR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
7304610 - Facilities | 0924 - Facilities Const
Subagency
7304610 - Facilities | 0924 - Facilities Const
Office
David Dethloff | Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 | odotfacbranchinvoices@odot.oregon.gov | (503) 986-5777
Contracting Office Address
Not available

Description

Prineville MS - Reroof project To replace the roof on the Prineville maintenance station. The new roof will be standing seam with concealed fasteners and mechanically locked seams. It will be installed over the existing roofing on a sub-purlin system. Base Bid: Provide all labor, materials, equipment and supervision to install a new roof system on the ODOT Maintenance Station in Prineville Oregon. Work includes installation of new roofing system per specified standards to ensure compliance with plans specs and all applicable building codes. New roof will get installed on a sub-perlin system over the exisitng roof. All roof penetrations to get new flashing systems. All work shall be completed in accordance with the project schedule, safety regulations, and quality control protocols. Base bid does not include snow gaurds. Alternate Addition 1: Supply and Install Snow Guards as shown in the project documents.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Executive summary

The Prineville MS Reroof project involves replacing the roof of the ODOT Maintenance Station in Prineville, Oregon, with a new standing seam roof supported by a sub-purlin system. The project scope includes all labor and materials necessary to install the roofing in compliance with applicable building codes and project specifications. Additional installation of snow guards is available as an alternate addition, reflecting specific project requirements and potential considerations for local climate conditions.

What the buyer is trying to do

The buyer aims to replace the existing roof with a new standing seam roof system that meets safety, quality control, and building code requirements while also considering climate-related modifications like snow guards.

Work breakdown
  • Provide labor for roof installation
  • Supply new roofing materials
  • Install sub-purlin system
  • Implement safety regulations
  • Conduct quality control measures
Response package checklist
  • Bid proposal
  • Cost breakdown including labor and materials
  • Proof of previous roofing experience
  • Safety and quality control plan
  • Timeline for project completion
Suggested keywords
roof replacementstanding seam roofingPrineville Maintenance StationODOTroofing contractor
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on the existing roof's condition
  • Specific building codes to comply with
  • Recency of applicable construction drawings
  • Availability of site for project access
  • Local weather considerations for project timeline

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.