SRCI Fire Door Replacement
Federal opportunity from Department of Corrections. Place of performance: OR. Response deadline: Aug 24, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
SRCI Fire Door Replacement
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Oregon Department of Corrections is seeking bids for the SRCI Fire Door Replacement project, with a response deadline set for August 24, 2023. This initiative emphasizes enhancing fire safety and compliance within the facility. Interested bidders should focus on their past experience in similar construction projects, particularly in correctional facilities.
The buyer aims to replace fire doors at the Snake River Correctional Institution (SRCI) to ensure compliance with safety regulations and enhance overall security.
- Assessment of existing fire door conditions
- Removal of old fire doors
- Installation of new fire doors
- Compliance checks with safety standards
- Final inspection and reporting
- Company profile and relevant project experience
- Proposed methodologies for installation
- Cost breakdown and pricing strategy
- Timeline for project completion
- Compliance documentation
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work is not specified.
- Exact specifications for fire doors are not provided.
- No information on the budget or funding is available.
- There are no site visit dates mentioned.
- No contact information for the buyer is given.
- Additional documentation requirements are unclear.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.