Arbor Terrace Apartments ADA Sidewalks & Ramps Improvements Project
Federal opportunity from C0101003 - H3S | C0106 - Community Development • Clackamas County. Place of performance: OR. Response deadline: Apr 02, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
Arbor Terrace Apartments ADA Sidewalks & Ramps Improvements Project Clackamas County (County), on behalf of Housing & Community Development Division, through their Board of County Commissioners is accepting sealed bids for the Arbor Terrace Apartments ADA Sidewalks & Ramps Improvements Project until April 2, 2026, 3:00 PM, Pacific Time, (Bid Closing). The site is located at 120 N Cole Avenue, Molalla, OR 97038. secure expansion on the west side of the Central Utility Plant building, Bowman Building Covered Parking Structure Project Feyrer Park Roadway
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Arbor Terrace Apartments ADA Sidewalks & Ramps Improvements Project is a significant undertaking by Clackamas County, focusing on enhancing accessibility through ADA-compliant sidewalks and ramps. Bids are accepted until April 2, 2026, at 3:00 PM Pacific Time. The project site is located at 120 N Cole Avenue, Molalla, OR, and is part of a broader initiative that includes work near the Central Utility Plant building and Bowman Building Covered Parking Structure.
The buyer is looking to improve accessibility at Arbor Terrace Apartments by constructing ADA-compliant sidewalks and ramps, thereby enhancing the safety and convenience for residents and visitors.
- Site preparation and clearing
- Construction of new ADA-compliant sidewalks
- Installation of ramps at designated locations
- Finishing work including signage and markings
- Completed bid form
- Proof of relevant experience
- Cost proposal
- Timeline for completion
- Compliance with construction safety standards
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget allocation for the project
- Detailed scope of work or plans
- List of required permits or approvals
- Contact information for project manager
- Benchmark projects for reference
- Local labor union considerations
- Existing conditions at the site
- Environmental assessments required
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.