BID #2025-80 Fairgrounds Rodeo Bleacher Replacement
Federal opportunity from Clackamas County. Place of performance: OR. Response deadline: Dec 11, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
BID #2025-80 Fairgrounds Rodeo Bleacher Replacement
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Clackamas County is seeking bids for the Fairgrounds Rodeo Bleacher Replacement under BID #2025-80, with a response deadline set for December 11, 2025. This project will require bidders to demonstrate specific capabilities in construction and installation. Bidders should prepare proposals that align with the needs of local fairgrounds infrastructure improvements.
The buyer aims to replace existing bleachers at the Fairgrounds Rodeo venue to enhance safety and attendee experience.
- Construction firms with experience in stadium or bleacher installation
- Local contractors familiar with Clackamas County regulations
- Companies specializing in public venue upgrades
- Site assessment and preparation
- Demolition of existing bleachers
- Installation of new bleacher structures
- Compliance with safety standards
- Final inspection and approval
- Completed bid proposal form
- Proof of past project experience
- Detailed project timeline
- Cost breakdown
- Insurance documentation
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- All work must comply with local building codes and safety standards
- Bidders may need to secure local permits prior to starting work
- Consider competitive pricing based on local market rates for construction
- Include potential cost escalations due to material shortages
- Possible collaboration with local subcontractors specializing in demotion and construction
- Consider teaming with companies experienced in public sector projects
- Potential permitting delays impacting project schedule
- Weather-related construction delays
- Cost overruns due to material price fluctuations
- What are the specific safety requirements for the new bleachers?
- Are there any anticipated challenges with local permitting processes?
- What is the expected timeline for project approval after bid submission?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No details on specific project budget or funding source.
- Lack of information regarding the existing condition of current bleachers.
- No specific performance requirements outlined for new bleachers.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.