Skip to content
Clackamas County

Lake Road health Center Flooring project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-C01010-00012201
DepartmentClackamas CountyStateORPostedDueJan 07, 2025, 02:00 PM UTCExpired

Federal opportunity from Clackamas County. Place of performance: OR. Response deadline: Jan 07, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Clackamas County
Agency
Not available
Subagency
Not available
Office
Tralee Whitley
Contracting Office Address
Not available

Description

Lake Road health Center Flooring project

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Lake Road Health Center Flooring Project in Clackamas County presents an opportunity for flooring contractors to deliver essential flooring work. Responses to this solicitation are due by January 7, 2025, which provides ample time for preparation. This project underscores the county's commitment to enhancing healthcare facilities, making it a vital contribution to community health infrastructure.

flooring installationhealth center renovationClackamas Countyconstruction contractshealthcare facilities
What the buyer is trying to do

Clackamas County is seeking qualified contractors to undertake flooring renovations at the Lake Road Health Center to improve the facility’s functionality and aesthetics.

Who should pursue this
  • Floors contractors with experience in health facilities
  • Local contractors familiar with Clackamas County regulations
  • Businesses with a track record of similar projects
Work breakdown
  • Assessment of existing flooring conditions
  • Removal of old flooring materials
  • Installation of new flooring as specified
  • Post-installation clean-up and site restoration
Response package checklist
  • Complete company profile
  • Detailed project experience and references
  • Proposed project timeline
  • Cost estimate and pricing strategy
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must comply with local health and safety regulations
  • Adherence to state contracting practices is required
Pricing strategy
  • Competitive pricing based on similar project benchmarks in the region
  • Consideration of material costs and labor rates in Clackamas County
Teaming and subs
  • Local flooring material suppliers for timely delivery
  • Potential subcontractors specializing in healthcare renovations
Risks and watchouts
  • Delays in material availability due to supply chain issues
  • Potential changes in project scope that could impact costs
  • Compliance with health codes during installation
Smart questions to ask
  • What specific flooring materials are preferred for this project?
  • Are there any access restrictions to the site during installation?
  • What are the expected completion timelines and milestones?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of flooring work required
  • Specific flooring materials to be used
  • Identification of existing flooring conditions
  • Budget estimates for the project
  • Any necessary regulatory requirements or permits
  • Information on available subcontracting opportunities
  • Project management structure or contact person
  • Timeline of project milestones beyond the deadline

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.